My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-07-13 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-07-13 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2009 3:45:46 PM
Creation date
7/9/2009 3:08:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
7/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7A <br />ATTACH~~tE!t 10 <br /> <br /> <br />e. Sweep streets daily (with water sweepers) if visible soil material is carried onto <br />adjacent public streets. Dust, sediment, and debris shall not be washed into the <br />storm drain system. <br />f. Excavation and grading activities shall be suspended and dust control <br />measures shall be implemented when winds exceed 25 miles per hour. <br /> <br />Mitigation Measure C-2: The project applicant shall implement all feasible <br />mitigation measures to reduce construction equipment exhaust emissions to limit <br />construction-related exhaust emissions. Such measures could include but are not <br />limited to: <br />. maintaining properly tuned engines <br />. minimizing the idling time of diesel powered n equipment to two <br />minutes <br />.. using alternative powered construction <br />electric) <br />. using add-on control devices such as <br />filters . <br />. using equipment that meets Ca' nia Air Resources Bo <br />recent certification standard fo d hea duty diesel eng <br />. phasing project construction; and <br />. limit the operating hours of heavy du <br /> <br /> <br />m .val which are protected <br />r 35 of the Redwood City <br /> <br />'or to t issuance of a building permit, the applicant <br />n r review and approval of the Planning Division. <br />Ian for the Kentfield project shall provide, at minimum, the <br />~uiv~lent to that which is agreed upon by the City Arborist <br /> <br />M <br />ahal <br />submitt <br />and ata <br />stampe <br /> <br />re D-3: Prior to the issuance of a building permit, the applicant <br />struction plans to the City's Arborist for review and approval prior to <br />e City for building permit. Approval may be by means of a signed <br />ad signature block on the plan set or by separate letter signed and <br />by the Consulting Arborist. <br /> <br />Mitigation Measure 0-4: The applicant shall submit a Tree Protection Plan <br />prepared by a qualified arborist determining specific measures and rehabilitation of <br />the aO-inch valley oak, Italian cypress trees, and two additional heritage sized trees <br />along the eastern property line. The plan is subject to. review and approval by the <br />City Arborist. ,t shall consider the potential impacts and construction practices for <br />all structures, including main buildings and accessory structures such as fences or <br />walls. Loss of any of these trees within two (2) years of construction is subject to <br />Mitigation Measure 0-1 which requires full replacement value. Furthermore, <br /> <br />Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.