Laserfiche WebLink
<br />7A <br />ATTACH~~~Ef 12 <br /> <br /> <br />Mitigation Measure G-2: Prior to demolition, a comprehensive lead based paint <br />(LBP) survey shall be conducted. If any LBP is identified, it shall be removed from <br />the site in accordance with all applicable regulations, including Cal/OSHA Lead in <br />Construction Standard, Title 8, California Code of Regulations (CCR) 1532.1 during <br />demolition activities. These requirements include employee training, employee air <br />monitoring, and dust control. If lead paint is peeling, flaking or blistered, it shall be <br />removed prior to demolition. It is assumed that such paint will become separated <br />from the building components during demolition activities; thus, it shall be managed <br />and disposed as a separate waste stream. Any debris or soil containing lead paint <br />or coat shall be disposed at landfills that are permitted to accept the waste being <br />disposed. <br /> <br />Mitigation Measure G-3: During all phases of <br />install and maintain temporary safety fencing to I: <br />active on-site construction activities, materials,. . <br /> <br />Mitigation Measure G-4: Structures on. <br />demolished shall be tented and fumig <br /> <br />onstruction, and subsequent <br />sions 0 City of Redwood City's NPDES <br />. lIution P vention Plan (SWPPP) outlining <br />uction phase measures to reduce pollutant <br />. itted for review and approval by the <br />partment prior to issuance of grading or <br /> <br />If the project is constructed during the wet season <br />asian control and/or sediment control plan, compliant <br />PDeS rmwater control) requirements, shall be prepared and <br />e sa faction of the Public Works Department, prior to the onset <br />and shall be maintained throughout the construction period. <br /> <br />ure H-4: .A revised drainage plan shall be submitted for review <br />by the Public Works Department prior to issuance of grading or <br />its. The drainage revisions shall include the following: <br /> <br />a. Storm drains with a filtration system to clean water before displacing it. <br />b. Grade and sub-grade level parking with a labeled method for water drainage. <br />c. A calculation of the existing quantity of storm water run off and plans for <br />maintaining the existing rate of runoff project's construction. <br />d. The building's foundation shall be constructed to include underground barriers <br />or mechanical systems to prevent lateral and vertical infiltration of contaminated <br />groundwater from the adjacent property to permeate the storm drains. <br /> <br />Page 8 of 11 <br />