My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-07-13 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-07-13 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2009 3:45:46 PM
Creation date
7/9/2009 3:08:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
7/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7A <br />ATTACH~A~~ 13 <br /> <br /> <br />Noise <br />Mitigation Measure K-1: The following construction noise control measures shall <br />be implemented to limit the amount of noise generated during the construction <br />period. These measures would mitigate the impact to a less than significant level: <br />a. Limit construction to daytime hours (8:00 am to 5:00 pm) Monday through <br />Friday, with no construction activities on weekends or holidays per Sec. 24.32 <br />of the City of Redwood City Municipal Code. <br />b. Construction activities or equipment shall not generate noise levels exceeding <br />110 dBA per Sec. 24.31 of the City of Redwood City Municipal Code. <br />c. Utilize "quiet" models of air compressors and other stationary noise sources <br />where technology exists. <br />d. Prohibit unnecessary idling of internal combustio <br />e. Equip all intemal combustion engine driven eq . <br />mufflers that are in good condition and appr <br />f. Locate stationary noise generating equip <br />sensitive receptors. <br />g. Designate a noise disturbance co <br />responding to any local complain <br />coordinator would determine t <br />too early, bad muffler, etc.) d <br />correct the problem. <br />h. Conspicuously post a telephone nurn <br />construction site and . the City. <br /> <br />responsible for <br />he disturbance <br />., starting <br />arranted to <br /> <br />ent with cordation of the Final Map, <br />each of the lots prohibiting all <br />rm of vehicle. except in defined <br />bject to review and approval of the <br /> <br />· Prior to or ncurrent with recordation of the Final Map, <br />. riction against each of the lots prohibiting tne <br />space ny use other than the parking of motor vehicles. <br />II be subject to review and approval of the City Attorney. <br /> <br />Prior to the final building inspection on the first <br />mpl ed, the applicant shall post guest parking signs and shall <br />ate all guest parking areas. The installation of the signs shall be <br />and approval of the Engineering and Construction Services <br /> <br />Mitigati easure 0-4: Prior to or concurrent with recordation of the Final Map, <br />the app cant shall record a deed restriction against each of the lots requiring all <br />owners, tenants, and guests to keep garage access free and clear of all <br />obstructions. The deed restriction shall be subject to review and approval of the <br />City Attorney. <br /> <br />Mitigation Measure 0-5: A range of traffic calming options shall be considered for <br />mitigating this impact including the installation of speed tables (e.g. very low profile <br />speed humps); street trees; signage; and/or enhanced pedestrian improvements <br />such as the provision of street trees, improved crosswalks, bike lanes/facilities as <br />applicable, and enhanced paths to transit. Because the impact is very slight, the <br /> <br />Page 9 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.