My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-07-13 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-07-13 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2009 3:45:46 PM
Creation date
7/9/2009 3:08:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
7/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1C <br />Page 13 <br /> <br />Wagstaff and Associates <br />City of Redwood City <br />June 26, 2009 <br /> <br />Contract Exhibit "A" <br />New Downtown Precise Plan EIR <br />Page 2h1 <br /> <br />2. PROPOSED SCOPE OF SERVICES <br /> <br />The detailed scope of services (tasks and subtasks) proposed by Wagstaff and Associates to <br />complete the new DPP EIR process is described below. <br /> <br />TASK 1. INITIAL SCOPING AND PROJECT DESCRIPTION <br /> <br />1.1 Initial Staff Meetina <br /> <br />Upon City authorization to proceed, an initial staff meeting will be conducted at the City, <br />including responsible City staff, City consulting legal counsel (optional), EIR Principal-in-Charge, <br />and EIR Project Manager to review and refine the new EIR work scope, format, and schedule, <br />and to review any specific additional information needs. <br /> <br />1.2 Proiect Description Update <br /> <br />The 2007 EIR project description will be updated as necessary for incorporation into the new <br />NOP and new EIR. For the 2007 EJR, City staff in consultation with the Planning Commission <br />identified a "Maximum Intensity" alternative and a less-intensive uModerate Intensity" alternative <br />to represent the range of maximum allowable development (M.A.D,) limitation that might <br />ultimately be adopted. The 2007 EIR impact and mitigation findings were based on these two <br />City-identified M.A.D, limitation scenarios. The City has since determined that the t1Moderate <br />lntensitytl alternative best represents City objectives for the Downtown. Accordingly, the new <br />EIR impact and mitigation findings will specify that the "Moderate Intensity Scenario" is the <br />"project" for the new DPP EIR. <br /> <br />The EIR consultants will request current City-approved versions of the M.A.D. limitation totals <br />for use in preparing the new EJR (staff anticipates that the totals will not change from those <br />presented in the 2007 EIR). <br /> <br />The project description update will also incorporate the revisions currently being completed by <br />City staff to respond to the court and achieve consistency with the anticipated new General <br />Plan, including more definitive shadow policy, expanded historic resource protection <br />requirements, associated building height and mass articulation control revisions, and other <br />revisions. The project description update will quantify the maximum combined amount of <br />additional residential development units, office and retail development floor area, and <br />commercial lodging rooms to be permitted within the Precise Plan area under the "project." <br />Similar to the 2007 EIR, the new EIR project description will include the following, revised as <br />necessary: <br /> <br />· project location, <br /> <br />II basic project goals and objectives. <br /> <br />c:\WD\PROPOSALS\oB07lrev-ex-aI0807 rev ex.a.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.