My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 1:10:28 PM
Creation date
2/19/2021 1:08:05 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Civil Engineering for CFD No. 2020-1 Seaport Centre/Seaport Plaza
RMP File Number
304
Date
2/19/2021
MO Ref
21-009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES AND FEE <br />This scope of services details BKF Engineers (Consultant's) work plan to provide civil <br />engineering services for the City of Redwood City, Community Facilities District (CFD) <br />No. 2020-1 (Seaport Centre/Seaport Plaza) Conditions Report for Wet Utilities Project. <br />The proposed new CFD will cover the cost of building new improvements as well as the <br />ongoing maintenance and operation of certain public improvements determined to be of <br />sole benefit to the parcels within Community Facilities District (CFD). <br />Consultant shall create conditions report for improvements of storm, water and sewer <br />utilities and facilities within the easement. This conditions report will be used for repair <br />and replacement plan for wet utilities. This repair and replacement plan for wet utilities <br />will inform the budget and tax assessment for the district. <br />Consultant shall perform site review, survey, and observations; evaluation of proposed <br />projects; preparation of probable construction cost; preparation of project prioritization, <br />assessment calculations; conditions report preparation and preparation of repair and <br />replacement plan, exhibits, schematic and conceptual drawings. <br />SCOPE OF SERVICES <br />Task 1. Data Collection and Existing Conditions Evaluations <br />Task 1a. Attend Coordination Meetings and Project Management <br />Consultant shall attend meetings, as needed, with the City and coordinate with property <br />owners and tenants to ensure timely progress is made. This includes coordinating site <br />access for sub -consultants and survey crews. <br />Task 1 b. Site Review, Survey, and Observations <br />Consultant shall perform a site walk of the pertinent area and shall perform, site review, <br />survey, observations and prepare conditions report on the following: <br />a. The condition of the storm drain system in easement, including one storm drain <br />pump station and approximately 1,000 feet of reinforced concrete pipe ranging in <br />size from 36 -inches to 60 -inches in diameter. <br />b. The condition of the sanitary sewer facilities in easement, including two (2) sewer <br />lift stations and approximately 900 feet of 8 -inch diameter polyvinyl chloride pipe. <br />c. The condition of the water facilities in easement, consisting of approximately 920 <br />feet of 8 -inch diameter and 1,240 feet of 10 -inch diameter polyvinyl chloride pipe, <br />and a sacrificial anode cathodic protection system to protect the metal valves and <br />fittings. <br />REV: 12-23-2020 PR <br />ATTY/AGR.2020.312/BKF Engineers (CFD No. 2020-1 Seaport Centre/Seaport Plaza) (Page 11 of 17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.