<br />5. Detailed Field Evaluation - Perform electrical continuity testing, electrical isolation testing <br />and cathodic protection current requirement testing. The new test stations will be used as <br />contact points to the 8-inch and 16-inch pipelines. The detailed testing will be used as the <br />basis for the design of the cathodic protection systems for the pipelines. <br /> <br />6. Letter Report - Submit a summary of the results of the preliminary and final field <br />evaluations, test station installation and direct assessment. Provide conclusions and <br />recommendations for corrosion control of the pipelines for the City's review and comment. <br /> <br />Phase II - Cathodic Protection System Design <br /> <br />The preliminary scope of work for this phase is indicated below. The final scope of work may <br />change from what is indicated but will be determined after the completion of Phase I. <br /> <br />1. Plans and Specifications - Prepare Details in AutoCAD format and Technical Specification <br />Section 13110 "Cathodic Protection" for the cathodic protection system. <br /> <br />2. Opinion of Probable Cost - Prepare an opinion of probable cost for the construction of the <br />cathodic protection system. <br /> <br />3. Assistance During Bidding - Provide assistance during bidding to review catalog cuts, <br />respond to RFl's and review material submittals. <br /> <br />4. Assistance During Construction - Provide assistance during construction to review <br />catalog cuts, respond to RFl's, review material submittals and provide on-site assistance. <br /> <br />We propose to complete this work on a time and materials basis at a total cost not to exceed $34,400 <br />with terms of net 30 days for Phase I. A separate estimate will be provided for the excavations and <br />V&A may request prepayment of the Contractor's invoice. A preliminary estimate for Phase II is <br />$25,000. This fee is valid for 90 days from the date of this proposal. The scope of work was <br />developed as a result of our discussion and represents our mutual understanding. Estimated costs for <br />the above project scope are itemized in the attached Resource Allocation Estimate. <br /> <br />These costs represent our best estimates at this time and may change subject to future <br />developments during the project. It is possible that some of the estimated manpower requirements for <br />specific task items may increase while others may not require the entire anticipated effort. This <br />provides us a greater degree of confidence in the overall project estimate, rather than in any given <br />particular task. <br /> <br />If unforeseen circumstances should arise which indicate that more time is required, we would provide <br />a written estimate of additional required time and cost. We will not proceed with work beyond the not <br />to exceed figure without a written authorization from your office. Charges to this project will be made <br />for actual time spent on the project and will be charged as per the attached Fee Schedule. We <br />request that you carefully review this proposal to assure that we fully understand the scope of the <br />work. Our Fee Schedule is adju.sted annually in January. Fees will be adjusted at that time and a new <br />Fee Schedule will be sent. Charges on the remainder of the project will be based on the new <br />schedule. <br />