My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 RKH Civil and Transportation Engineering (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 RKH Civil and Transportation Engineering (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 2:14:13 PM
Creation date
7/28/2009 11:42:28 AM
Metadata
Fields
Template:
Agreement
Contractor Name
RKH
PROJECT NAME
Traffic Engineering Services - Peninsula Christian School
RMP File Number
304
Date
7/21/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Peninsula Christian School. Redwood City <br />Proposal to Provide Traffic Engineering Services <br /> <br />C. RKH will conduct a field review of the study area streets and intersections to <br />inventory intersection controls, on-street parking, posted speed limits and pedestrian <br />facilities. <br /> <br />2. Existing Conditions. <br /> <br />A. RKH will create a traffic analysis network of the study area streets and intersections <br />using the TRAFFIX network modeling program.1 <br /> <br />B. RKH will calculate the LOS (Levels of Service) at each of the four study area <br />intersections for the morning (7-9 a.m.), afternoon school (2-4 p.m.), and afternoon <br />commute (4-6 p.m.) peak hours. <br /> <br />3. Project Traffic. <br /> <br />A. RKH will estimate peak hour and daily traffic generation for the school based on data <br />provided through the City by the school owner(s). The data should include time of <br />day and numbers of students arriving and leaving the school. The data should <br />indicate the number of children per vehicle. <br /> <br />B. RKH will estimate project vehicle distribution on the surrounding street system based <br />on data provided through the City by the school owners. The data should include the <br />nearest cross street intersection of the residence of each of the students attending the <br />school. <br /> <br />4. Project Traffic Impacts. <br /> <br />A. RKH will add project traffic to existing traffic through the four study area <br />intersections for the morning and afternoon peak traffic hours. <br /> <br />B. RKH will calculate the LOS (Levels of Service) for Existing + Project conditions at <br />each of the four study area intersections for the morning (7-9 a.m.), afternoon school <br />(2-4 p.m.), and afternoon commute (4-6 p.m.) peak hours. <br /> <br />C. RKH will calculate the change in daily traffic volumes (Existing + Project) on the <br />surrounding street system. <br /> <br />2 <br /> <br />1 Dowling Associates, Oakland, CA, TRAFFIX 8.0 RI, Built November 23,2008 <br /> <br />~.w.a+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.