My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 RKH Civil and Transportation Engineering (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 RKH Civil and Transportation Engineering (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 2:14:13 PM
Creation date
7/28/2009 11:42:28 AM
Metadata
Fields
Template:
Agreement
Contractor Name
RKH
PROJECT NAME
Traffic Engineering Services - Peninsula Christian School
RMP File Number
304
Date
7/21/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Peninsula Christian School, Redwood City <br />Proposal to Provide Traffic Engineering Services <br /> <br />5. Site Access, Circulation and Parking. <br /> <br />A. RKH will evaluate site ingress/egress on Charter Street taking into consideration <br />comer sight distance, safety, and queuing. <br /> <br />B. RKH will evaluate on-site circulation with respect to student and drop off and pick up <br />areas as well as and pedestrian and bicycle circulation. <br /> <br />C. RKH will evaluate the project's compliance with City Code parking requirements and <br />will estimate peak parking requirements based on data contained in Parking <br />Generation, 3rd Edition2. <br /> <br />6. Draft Report. RKH will prepare a draft report with text and graphics which will contain <br />the traffic impact analysis, findings, conclusions and recommendations for mitigating <br />identified traffic impacts. RKH will submit the draft report to the city for review and <br />comment. <br /> <br />7. Final Report. Upon receipt of written comments on the draft report, RKH will prepare the <br />final report. The final report will be submitted to the city for use in the project review and <br />approval process. <br /> <br />8. Public Meeting. RKH will attend one public meeting on the project. <br /> <br />ADDITIONAL SERVICES <br /> <br />The following are services outside of and in addition to those described as Basic Services: <br /> <br />1. Extra work due to changes in the project, delays, work not specifically described in the <br />Basic Services, and all other causes not the fault of RKH; <br /> <br />2. Changes in documents after approval and/or acceptance; <br /> <br />3. Collection and evaluation of new traffic data not specified in the Basic Services; <br /> <br />4. All public agency permits and permit fees, licenses and other such charges associated <br />directly with the project; <br /> <br />5. Attendance at public meetings not specified in the Scope of Basic Services. <br /> <br />3 <br /> <br />2 Institute of Transportation Engineers, @ 2004. <br /> <br />~~-I-I- <br />
The URL can be used to link to this page
Your browser does not support the video tag.