Laserfiche WebLink
6.1 B <br /> Page 15 <br /> �� ��r�=�r;�b�.�:-� <br /> �� <br /> EXHIBIT A - SC�PE OF 1�fORK <br /> For the noted areas with def ciencies, BKF wi.11 determzne approximate quantities. These <br /> quantities will be used to establish Engineer's Opinion o�Probable Construction costs to <br /> campare the alternatives. <br /> Additional summaries for comparison of the a�ternatives will include Iisting the constrain�s <br /> and adjacent impacts, such as access from connec�ing roads. <br /> Deliv�rables: <br /> A Draft Pre-Design TechnicallVlemorandum will be provided to the City summarizing the <br /> a�ternatives and the cost for each at the various repair locations. Exhibits depicting the <br /> cross section of each altemative will be included in the Report. Geotechnical f ndings and <br /> recommendations will be included. <br /> Task ld. Pre-Design Report Evaluat�on <br /> One meeting will be held to discuss the Draf� Pre-Design Report. Conunents will be <br /> discussed and used as the basis for Plans and Specifications. A preferred altemative will <br /> be estab�ished. <br /> Deliverabies: Summary of ineeting documenting the prefenred alternative <br /> Task le. Geotechnical Services <br /> Please refer to the atta.ched proposal from ENGEO for additional detail. <br /> Levee Repair Design Consultation and Analysis: <br /> - Review existing subsurface information �obtazned under separate contract) for areas <br /> requiring repair identified by the design team <br /> - Provide design criteria and mitigation al.tern.atives for levee repair <br /> - Interface with BKF in selection of preferred alternatives <br /> - Provide slope stability and settiement analysis for proposed le�ee�o be raised <br /> - Prepare report summarizing findings and recommendations <br /> Task 2.Cunstruetiun Doeuments <br /> Task 2a. Coordination <br /> BKF will attend one coordination meeting with City and County staffto discuss design <br /> concepts and constraints. <br /> BKF will coordinate with the City of Redwood City, City of San Carlos,County of San <br /> Mateo, San Ca�rlos Auport,the Aimort's FAA consulta.nt,and other consulta.nts as needed. <br /> We assume communication will be mainly via e-mai�and telephone. Coordination will <br /> include preparing exhibits,as needed,to convey design intent and gain consensus. <br /> _,..__..._�._.:.........:...._.._...s�.._.�_�.�._�_....._._.w....w.....__,:.,:..:�:.:.....:�...._.�.._.:.:.:.:._.:�_...�.......Y...�_....._.w_------_...._�_.....�..__�_.__.._...._.._..___._...,..�._w_�._._.............�._.�.�.::.�:....:�::.::__.:....:.:.:......_..........:.�4_...._.........�_..._..:.:M.... <br /> �::ty a#���e�dvuac;d r,`i�y—�:ec�;nroc�ci�:�orc:s i_e��c��gr���3i'Gi/'E.-'i'YiF:i�'���—:a;��n:.;ar�cs x�;rrlt�rt�,�c�;r�r1i �u�f.%.��t�_�Z;�t3#� <br /> !��i�:J;.zly'I t;,2G�J ua���s�t.t�bf.€;a�r� <br />