My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 A & F Engineering
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 A & F Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2009 11:23:50 AM
Creation date
8/12/2009 11:22:27 AM
Metadata
Fields
Template:
Agreement
Contractor Name
A & F Engineering Inc
PROJECT NAME
Lower Stulsaft Park Restaurant Restoration
RMP File Number
304
Date
7/6/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A & F Engineering Inc <br /> <br />DATE July 6,2009 <br />Quotation # 108 <br />Customer 10 <br /> <br />2143 Madison Ave <br />Redwood City, Ca 94061 <br />Ph:650-862-7726 Fax: 650-257-7517 <br />650-722-0281 <br /> <br />Quotation valid until: July 16, 2009 <br />Prepared by: Frank Fratti <br /> <br />City of Redwood City <br />Engineering & Construction Dept <br />1017 Middlefield Road <br />Redwood City Ca. 94063 <br /> <br />Attention: Carlos EspinosalTerrence Lewis <br /> <br />Comments or special instructions: <br /> <br />Description <br />to trench from meter ped to 17x30 box 219 ft and place 1 -3inch conduit <br />trench from 17x30 box 428 ft to upper bathroom with one 11 x17 box at 200ft <br />trench from 17x30 box 510ft to bridge with one 11 x17 box at 200 ft and one 11 x17 box at 400 <br />ft <br />place 45 ft steel 2 in. conduit mounted to side of bridge and one 11 x17 box at each end of <br />bridge <br />trench from 11 x17 box at bridge to 11 x17 box at lower bathroom place 2 inch conduit <br />backfill all trench line with native and compact <br />1282 ft trench <br />45 ft bridge <br />pull in 3 # 3 wires and 1 # 6 wire to each bathroom <br />install new tesco meter pedastal <br />remove existing meter and provide feed from new panel to existing <br />make connections <br /> <br />Labor $9292.00 and Material $9682.00 (this is without using transformers) $ <br /> <br />.::; <br /> <br /> <br />Thank you <br /> <br />TOTAL <br /> <br />A & F Engineering, Inc <br /> <br />ACCEPTED <br /> <br />DATE <br /> <br />THANK YOU FOR YOUR BUSINESSI <br /> <br />AMOUNT <br /> <br />18,974.00 <br /> <br />$18,974.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.