My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Callander Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Callander Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 8:24:36 AM
Creation date
8/18/2009 8:24:35 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Callander Associates
PROJECT NAME
Hawes Park Landscape Architecture and Planning Services
RMP File Number
304
Date
8/17/2009
MO Ref
09-171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT ft- <br /> <br /> <br />Callander Associates <br /> <br />I. Detailed Project Approach <br /> <br />Since 1982) when plans for Boothbay Park in Foster City were completed in six weeks, through 2006, when plans for five high <br />school bowl renovations (bId cost: $11M) were completed in five months, through today, the ability to deliver significant projects <br />with aggressive schedules has been a hallmark of Callander Associates. We are pleased to provide you with the following project <br />approach based on our experiencet and your project! This approach is a draft, subject to change as warranted to best address your <br />needs. We understand that: <br /> <br />. The goal of the improvements is to substantially reduce water consumption while providing a sportS faciUty with more <br />capacity and llex.ibUity. Used primarily as a ballfield, the facUity also accommodates Junior 4gers football and youth soccer. <br />. Parking and spectator seating are generally adequate but dugouts and a concession facUity are absent. <br />· The restrooms do not meet current access requirements and the bleachers are absent the shade that was a component of the <br />bleachers prevIously. <br />. In renovating the facility, soils beneath the bleachers must be handled according to strict protocols due to the presence of <br />lead from paints used over the years on the bleachers. <br />. Storage capacity is absent and the desire is to capture the space that is currently lost beneath the bleachers if feasible. <br />. The scorekeeperts booth and scoreboard are dilapidated and will need to be replaced. <br />· The outfield will be converted to synthetic turf. <br /> <br />Prefabricated elements (bleachers, shade structurest buildings) provide a means of controlling costs and expediting project delivery <br />and opportunities for their use will be explored in depth at project outset. <br /> <br />The construction budget established for the project is $1.3M. More funding may be secured later but a completet functional facility <br />must be deUvered assuming no increase in project funding. Plans must be completed in October 2009, consistent with the goal of <br />havIng the facility back on line for opening day in AprH 2010. <br /> <br />We propose the following scope of work. The items shown in hold/ace Italics represent the deliverable work products to be provided <br />upon completion of a specific task. Our specific scope of services would be as follows: <br /> <br />1.0 PRQJECT INITIATION <br /> <br />1.01 Design Team Meeting #1: Review the project scope, community outreach plan, project schedule and costs with City staff. <br />First half of meeting to be conducted at City offices followed by a site visit to review specific elements of the facility with <br />staff. Obtain City furnished documents including topographic survey, lead survey, work products (notes, minutes) associated <br />with project prior to this phase of services. IdentifY applicable City standards (design guiddines, water conservation <br />ordinancest furnishings and materials standards).Prepare and submit meeting summary documenting decisions and required <br />follow up. <br /> <br />1.02 Data Gathering: Obtain documents identified in initial meeting and other information relevant to the project. Review <br />existing design guidelines~ documents~ or other existing base information provided by City. Prepare summary memo. <br /> <br />1.03 Site Reconnaissance: Conduct site reconnaissance. Evaluate existing conditions. Photograph site for in-house study and <br />reference. Prepare Jig/till photo kg for studio and presentation use. <br /> <br />1.04 Horticultural Salls Analysls: Obtain up to two horticultural soils samples to establish amendment, fertilizer and <br />maintenance recommendations for landscaped areas; submit letter report. <br /> <br />1.05 Geotechnical Report: Secure the services of a geotechnical engineer for provision of a geotechnical investigation. Soils <br />report to address pavement design, synthetic turf field subgrade and base materialst soil bearing capacity information <br />required by structural engineer to design building foundation. The soils information will also be utilized in estimating <br />drainage requirements. The report recommendations will be incorporated in earthwork and compaction requirements. <br />Provide summary repO'l't. <br /> <br />1.06 Conceptual Plan: Prepare a eoncept p14n, incorporating all elements in the RFP and identified subsequently with City <br />staff. Plan to be prepared at a scale of 1 "=10t and color rendered suitable for public presentation. Prepare a sJtefurnishin&f <br />Image hoard showing major elements of plan Including buildings, shade structures and scoreboard. <br /> <br />1.07 Cost Estimate: Prepare an I$ttmate ofpt'obable constrUCtion eDIt based on documented bid costs for similar improvements <br />on other projects. Estimate to include bondin~ mobilization, construction and design contingencies. <br /> <br />Proposal for Landscape Architectural Design COllSldting Services for Hawes Park I 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.