Laserfiche WebLink
<br /> <br />Callander Associates <br /> <br />I. Detailed Project Approach <br /> <br />3.02 Cost Estimate: Prepare a landscape architect's estimate of bid, In format to match <br />bid form. <br /> <br />3.03 Design Team Meeting #4: Present the drawings) specifications) cost estimate, and <br />design development book. Review specific aspects of the project including budget) <br />construction details, vendor provided furnishings and implementation schedule. <br />Provide five (5) sets of plans for distribution to various City departments. Develop <br />consensus for proceeding and document meeting in a meeting summary. <br /> <br />3.04 Construction Documents - Final Submittal: Proceed to complete construction <br />ucumentl and SWPPP. Plans shall adhere to City of Redwood City Standards Goto Park <br />for plans and Specifications. Submittal to include reproducible plans on vellum, <br />standard specifications, and estimate of project costs. <br /> <br />3.05 Updated Cost Estimate: Prepare an updated landscape architect', estimate of bid. <br /> <br />3.06 Project Archive: Provide one CD.ROM archive of all electronic data including <br />COll$truction documents, specifications, cost estimates, topographic survey and base <br />information provided by the City. <br /> <br />4.0 BIDDING AND CONSTRUCTION ADMINISTRATION <br /> <br />4.01 During the bidding and construction period we would propose to provide <br />supplemental services to assist your construction administrator. These services <br />would be provided on an hourly basis as requested. Suggested services include: <br /> <br />a. Respond to biddels questions and issue mldenda during bid period. <br />b. Incorporate addenda into conform drawings prior to start of construction. <br />c. Review shop drawings and submittals. Respond to contractor requests for <br />information. <br />d. Attend up to six on.site construction reviews with four site visits during <br />construction to assist City inspection staff; followed by writtenfield reports. <br />Respond to change order requests. Conduct a substantial completion and final <br />walk through and prepare punch lists for each. <br />e. Revise construction documents to incorporate "Record Information" as provided <br />by Contractor for City "As-built" records. Provide one camera.ready set of <br />Record Documents. <br /> <br /> <br /> <br /> <br />5.0 ADDITIONAL SERVICES <br /> <br />5.01 All tasks not specifically noted above could be performed as additional services. These tasks would include, but are not <br />limited to, architectural plan and specification preparation for custom restroom building. building department permitting. <br />CEQA documentation, arborist's services, all revisions or additional submittals required by the City or any other agenc;y's <br />review> other meetings> additional design studies. or other tasks not specifically noted in the foregoing. These services would <br />be billed hourly or on a lump sum fee basis to be documented in a written amendment to this agreement. <br /> <br />6.0 COMPENSATION SUMMARY <br />Callander Nolte Zeiger BCA. GeoPorensics TOTALS <br />1. 0 Project Initiation... .......... .......... ..... $12,895......... $0.... ..........$0........ ..... $0....... ...... $3,500................ $16,395 <br />2.0 Preliminary Design........ ........ ........ $15,598......... $3.008....... $1 ,370...... $2,000...... $0..... .... ...............$21,976 <br />3.0 Construction Documents........ .......$40>082.. ....... $4,794..... ..$9, 115...... $8.650...... $1,000.................63,641 <br />4.0 Bidding and Construction <br />Administration............ ............... .... $26,754..... .... $0....... ...... $1,200...... $750......... $2,000. ......... .... ...$30,704 <br /> <br />5.0 Additional Services (hourly, lIS requested)... .......... .................. ............ .......................... ......... ....... ..... ..... ...$0 <br /> <br />Subtotals................. .................. ..... $95,329......... $7.802....... $11,685.... $11.400.... $6,500 <br /> <br /> <br />TOTAL COMPENSATION. .... ............... .......... ....... ..... ......... .... ................ ............ ..... ............... .... ....... ........$132,716 <br /> <br />Proposal for Landscape Architectural Design Consulting Services for Hawes Park I 3 <br />