My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-08-24 clsd and reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-08-24 clsd and reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2009 11:58:43 AM
Creation date
8/20/2009 2:22:04 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
8/24/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REPORT <br /> <br />6.2A <br />age 1 <br /> <br />To the Honorable Mayor and City Council <br />From the Ci Mana er <br /> <br />August 24, 2009 <br /> <br />SUBJECT <br />Award of Contract - Main Library Tenant Improvements and HVAC Replacement <br />Project <br /> <br />RECOMMENDATION <br />1. Approve, by motion, the contract documents for the Main Library Tenant <br />Improvements and HV AC Replacement Project and award the contract to Rodan <br />Builders Inc., of Burlingame for their responsive and responsible low base bid of <br />$635,000.00, and authorize the City Manager to increase the contract amount up to <br />1 00/0 if necessary. <br /> <br />2. Approve, by resolution, amendment to the current budget to reallocate $285,000.00 <br />from Capital Projects Fund - Contingency to Capital Projects Fund... Main Library <br />2006 Renovation to provide the additional funding required for this project. <br /> <br />BACKGROUND <br />The main library at 1044 Middlefield Road was last renovated in 1987. Conceptual <br />planning and design efforts have been ongoing since 2006 for proposed improvements <br />to both reconfigure the second floor interior space and replace the time-worn HVAC <br />system. Council has previously approved the sole source purchase of replacement <br />HVAC units for this project. The proposed contract includes the work to install the new <br />HVAC equipment and the major renovation of interior space. Renovation of the interior <br />space includes reconfiguring second floor area to better accommodate Project Read <br />activities, the addition of 30 internet stations, a new Teen area, expansion of the <br />language activities area, and to provide quieter study rooms. The technology lab wiring <br />will also be upgraded to support the increased number of computers. <br /> <br />The nine (9) bids received at the bid opening on July 29,2009 are summarized in the <br />table below. <br /> <br />Bidder Bid Amount <br />ICC General Contractors, Inc. ... Sunnyvale $464,400.00 <br />Rodan Builders, Inc. - Burlingame 635,000.00 <br />Page Construction Co., Inc. - Novato 711.411.00 <br />P & A Construction Co. - San Francisco 750,000.00 <br />Coastside Associates - Half Moon Bay 753.413.00 <br />Hollander Smith, Inc. - Milpitas 811,390.00 <br />Lyncon Construction, Inc. - San Jose 843.444.00 <br />John Plane Construction, Inc. - Brisbane 957,780.00 <br />Universal Building Systems Co., Inc. - Palo Alto $1,150,000.00 <br />Engineer's Estimate $646,000.00 <br />Recommended Bidder: Rodan Builders, Inc. <br />Substantiation: Rodan Builders, Inc. is the lowest responsive and <br />responsible bidder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.