Laserfiche WebLink
<br />SBWMA <br />San Carlos, CA <br /> <br />Order Confirmation 7l77-R4 <br />June 30, 2009 <br /> <br />~$tr- <br /> <br />Price for Conveyors as listed above: ......................................................................................................... $3,649,805. <br /> <br />Section C: Other Equipment <br /> <br />Item 80 Relocate Existing Baler (Included in Mechanical Costs) <br />Item 91 IPS Conquest 180-200 <br />Item 103 IPS Film Baler <br />Item 130 OCC Walking Floor <br />Item 131 Mixed Fiber Walking Floor <br />Item 132 ONP Walking Floor (2 Each) <br />Item 175 Residue Weigh Belt Scale <br />Item 249 Two (2) Compressors 100 HP <br />Item 263 20 Camera Surveillance System <br />Item 264 Task Lighting (for conveyor pits and other areas) <br /> <br />Price for Other System Equipment as listed above: .................................................................................. $1,260,934. <br /> <br />Section D: BHS Structure Steelwork <br />(All platforms, landings, control room, stairs, chutes, skirt walls, pit plates, supports, push walls, container bins, <br />hoppers and throw chutes.) <br />Price for all structures and steelwork as listed in proposal: .................................................................... $3,270,973. <br /> <br />Section E: BHS Controls Package <br /> <br /> <br />Price for Controls System: .... ........................... ....................... ..... ............. ........................................... ...... $1,337,819. <br /> <br />Section F: BHS Project Management <br />Project Management, Engineering, Site Visits, Start-Up & Training: ....................................................... $228,500. <br /> <br />Section G: BHSMechanical & Electricalln.5tallation <br />Mechanical & Electrical Installation & Security:..................................................................................... $2,462,368. <br /> <br />Section H: BHS Recommended Spare Parts <br /> <br /> <br />Spare Parts as listed in proposal: ................................................................................................................... Included <br /> <br /> <br />Total System Price Installed, excluding freight: .................................................................................... $15,473,980. <br />Estimated Freight (58 loads) to Site, San Carlos, CA: ................................................................................. $139,200. <br />All freight costs are billed at actual cost pre-pay and bill. <br /> <br />Deliverv & Installation Schedule: (Based on 70 week schedule.) <br /> <br />. Order placement, down payment by September 2009. <br />. General arrangement drawings approved by January of 20 1 O. <br />. Fabrication and shipment from factory, April of20l0 completed by September of20l0. <br />. Installation complete for start-up of operation and training January 3,2011. <br /> <br />2A MRF Sorting Equipment <br />43 of 46 <br /> <br />Bulk Handling Systems (BHS) <br /> <br />Page 43 <br />