My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SBWMA <br />San Carlos, CA <br /> <br />Order Confirmation 7l77-R4 <br />June 30, 2009 <br /> <br />..-----..----""'4;wr------------ <br /> <br />Payment Terms: <br /> <br />Sections A, B, C, D, E & F <br /> <br />20% Down payment with signed order/PO, to begin general arrangement drawing. <br />20% Progress payment, due upon acceptance of approval drawings, not to exceed 60 days from placement <br />of order. <br />20% Payment due 12 weeks after receipt of signed approval drawings. <br />20% When equipment is fabricated, upon notice of pending shipment. Payment to be received prior to <br />shipment from BHS factory <br />15% Payment due upon arrival of substantially all equipment at site. <br />5% Upon completion of installation and start-up, payment not to exceed 60 days from arrival of equipment <br />to site. <br /> <br />Sections G (Mechanical & Electricallllstallatiol1) <br /> <br />25% Down payment with signed order and PO, to begin general arrangement drawing. <br />25% Payment due at first equipment shipment from BHS factory. <br />20% Payment due 45 days after first shipment date. <br />20% Payment due upon delivery of substantially all equipment to site. <br />10% Upon completion of installation and start-up, payment not to exceed 60 days from arrival of equipment <br />to site. <br /> <br />Exclusions~ Exceptions & Clarifications: <br /> <br />1. BHS will arrange receiving, unloading, installation of BHS equipment. BHS will arrange storage and <br />security on site inside building. <br />2. Concrete or other civil work. <br />3. Construction or building pennits, except electrical which BHS will arrange. <br />4. Any and all applicable taxes. <br />5. Any demolition and disposal of existing equipment or structures other than relocation of existing baler. <br />6. All installation labor is quoted at straight time. <br />7. Fire Suppression: Not included in scope based on SBWMA, information provided in Addendum 3. <br />8. Any costs to bring additional power to the MCC unit beyond what has been specified by BHS. <br /> <br />Please confinn order by signing and faxing to (541) 485-6341 to begin processing or email to sales@bhsequip.com. <br />Please provide purchase order number if required. <br /> <br />A1!reed to and accepted by: <br /> <br />~rvI~ <br /> <br />~/ <br /> <br />Kevin McCarthy <br />SBWMA <br /> <br />Steve Miller <br />Bulk Handling Systems <br /> <br />Date: <br /> <br />Date: June 30. 2009 <br /> <br />2A MRF Sorting Equipment <br />44 of 46 <br /> <br />Bulk Handling Systems (BHS) <br /> <br />Page 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.