My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTACHMENT 2E <br /> <br />Contamination Measurement Methodology: Single Loads <br />MEASURED CONTAMINATION LEVELS <br /> <br />The Contractor is expected to successfully process individual loads delivered to the <br />Shoreway Center that do not contain contamination in excess of the following <br />percentages by weight of load. <br /> <br /> <br /> <br /> <br /> <br />If visual inspection of a load causes Contractor to suspect that it contains contamination <br />in excess of the foregoing levels (Table 1), it may direct that the load be set aside for <br />sampling in accordance with the methodology specified for single load measurement in <br />this Attachment 2-E. <br /> <br />If upon visual inspection of an inbound load, the Contractor believes it exceeds the <br />contamination threshold percentage, it will isolate the load and immediately contact a <br />designated representative from both the Collection Contractor and the Authority prior to <br />conducting any contamination sampling. Representatives of the Collection Contractor <br />and the Authority will be provided the opportunity to inspect the isolated load within four <br />(4) hours of being notified by the Contractor. If the Collection Contractor or the Authority <br />is interested in observing the sampling and testing of the load, the Contractor will <br />schedule time for sampling that is within eight (8) hours of having provided notification. <br /> <br />If the measured contamination level for the load, as determined by the methodology set <br />out in this Attachment 2-E, does not exceed the contamination level above in Table 1, <br />then Contractor (1) shall process the load as required by the Agreement, and (2) shall be <br />responsible for the cost of the contamination measurement procedure. <br /> <br />Facility Agreement, Attachment 2E <br />Contamination Measurement Methodology <br />Page 1 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.