Laserfiche WebLink
<br />ATTACHMENT 2E <br /> <br />Contamination Measurement Methodology: Single Loads <br />MEASURED CONTAMINATION LEVELS <br /> <br />The Contractor is expected to successfully process individual loads delivered to the <br />Shoreway Center that do not contain contamination in excess of the following <br />percentages by weight of load. <br /> <br /> <br /> <br /> <br /> <br />If visual inspection of a load causes Contractor to suspect that it contains contamination <br />in excess of the foregoing levels (Table 1), it may direct that the load be set aside for <br />sampling in accordance with the methodology specified for single load measurement in <br />this Attachment 2-E. <br /> <br />If upon visual inspection of an inbound load, the Contractor believes it exceeds the <br />contamination threshold percentage, it will isolate the load and immediately contact a <br />designated representative from both the Collection Contractor and the Authority prior to <br />conducting any contamination sampling. Representatives of the Collection Contractor <br />and the Authority will be provided the opportunity to inspect the isolated load within four <br />(4) hours of being notified by the Contractor. If the Collection Contractor or the Authority <br />is interested in observing the sampling and testing of the load, the Contractor will <br />schedule time for sampling that is within eight (8) hours of having provided notification. <br /> <br />If the measured contamination level for the load, as determined by the methodology set <br />out in this Attachment 2-E, does not exceed the contamination level above in Table 1, <br />then Contractor (1) shall process the load as required by the Agreement, and (2) shall be <br />responsible for the cost of the contamination measurement procedure. <br /> <br />Facility Agreement, Attachment 2E <br />Contamination Measurement Methodology <br />Page 1 of 15 <br />