Laserfiche WebLink
<br />I. Additional Materials Processina. The AUTHORITY may want to recycle <br />additional materials beyond those specified in this Agreement. At the request of <br />the AUTHORITY, the Contractor (within 60 days) shall propose a plan for the <br />processing and marketing additional materials targeted for recycling. The plan <br />shall include projected labor, equipment and space requirements, and an <br />analysis of costs and revenues related to the recycling effort. The AUTHORITY <br />may accept, reject or modify any such plan and Contractor shall be entitled to <br />compensation for implementing the plan as agreed to by the Parties. <br /> <br />J. Coordination with Collection Contractor. Contractor will work closely and <br />coordinate with the Collection Contractor to ensure that on-site traffic flows <br />smoothly and efficiently, that inbound materials are delivered to the proper <br />location on the Shoreway Center property, and that materials delivered to the <br />Shoreway Center are of acceptable quality. <br /> <br />K. Sionaae. The AUTHORITY will post signs at the Shoreway Center to control <br />traffic and to inform users of the Shoreway Center of pertinent information (e.g., <br />regulations, hours of operation, material types accepted, rates charged, and a - <br />local telephone number t-o call for information or in case of emergenGY). <br />Contractor shall maintain and repair these and other on-site signs. Contractor <br />shall not post an>, signs without the prior written consent of the AUTHORITY. <br /> <br />L. Traffic Control. Contractor shall be responsible for the safe control and direction <br />of traffic once it enters the Shoreway Center. Contractor will ensure that on-site <br />traffic is controlled and directed so that vehicles move around the site in a safe <br />and efficient manner. Contractor shall make optimal use of queuing lanes and <br />unloading spaces and shall operate and park vehicles so as not to impede on- <br />site traffic flow. <br /> <br />M. Control of Blowina Debris. Contractor shall sweep daily (1) all areas within the <br />Shoreway Center, and (2) Shoreway Road, collecting all debris in these areas. <br />Debris so collected shall be disposed of at the Shoreway Center. <br /> <br />N. Vector Control. Contractor shall conduct the operation of the Shoreway Center in <br />such a manner as to ensure that conditions are unfavorable for production of <br />rodents or insects. In the event that rodent or insect activity becomes apparent <br />to the Local Enforcement Agency or the AUTHORITY, supplemental vector <br />control measures shall be initiated by Contractor, as directed by the Local <br />Enforcement Agency and/or the AUTHORITY. <br /> <br />O. Odor. Dust and Noise Control. Contractor shall control odor and dust at the <br />Shoreway Center by use of installed dust and odor control systems in place at <br />the transfer station. <br /> <br />P. Fire Control. Prior to commencing operations at the Shoreway Center, <br />Contractor shall submit a fire control/handling plan for the Shoreway Center and <br />obtain approval from the AUTHORITY. <br /> <br />Q. Personnel. Contractor is required to provide sufficient numbers of qualified and <br />trained staff necessary for operating the Shoreway Center, transporting of <br />materials, recovering and marketing recyclables, and other obligations necessary <br />to operate the Shoreway Center. The initial number of employees and workers <br />dedicated by the Contractor for operations at the Shoreway Center is shown in <br />Attachment 9, Staffing Plan. <br /> <br />Facility Agreement, Attachment 3 <br />General Operating Standards and Procedures <br />Page 2 of 13 <br />