My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />There will be at least one employee of the Contractor (or a designated sub- <br />contractor or security company) physically in attendance at the Shoreway Center <br />at all times, whether or not the Shoreway Center is operating or open. <br /> <br />During the hours of 6 a.m. to 5 p.m., seven (7) days a week, there will be a <br />manager or lead worker who is the representative of Contractor on-site. At all <br />other times, there will be a supervisory employee designated as emergency <br />coordinator who will be on-call. Employees who are on-site (and the <br />AUTHORITY staff) will be instructed how to contact this emergency coordinator. <br /> <br />R. Trainina of Personnel. Contractor shall provide adequate operational and safety <br />training for all of its employees who are involved in performing operations at the <br />Shoreway Center. <br /> <br />S. Eauioment. Contractor is required to purchase, lease, or otherwise procure, all <br />rolling stock, materials, and supplies necessary for operating the Shoreway <br />Center, transporting solid wastes, recovering and marketing recyclables, and <br />performing all other obligations under this Agreement. All equipment provided by <br />Contractor for use at the Shoreway Center shall be. new off-road and on-road <br />rolling stock (Le., loaders, forklifts and tractor trailers). Six months prior to the <br />commencement of services by the Contractor, the Contractor shall submit to <br />AUTHORITY a list of the equipment for use at the Shoreway Center and in the <br />transfer of materials, including manufacturer, model number, description, etc. <br /> <br />1) All equipment shall comply with all applicable federal, state, and local laws, <br />including (1) U.S. Department of Transportation: Federal Motor Vehicle <br />Safety Standards; Federal Motor Carrier Safety Regulations; Interstate <br />Motor Carrier Noise Emissions Standards, (2) U.S. Environmental <br />Protection Agency: Control of Air Pollution from New Motor Vehicles and <br />New Motor Vehicle Engines, and (3) Bay Area Air Quality Management <br />District. <br /> <br />2) All tractors and transfer trailers (individually and in combination) shall <br />comply with the applicable laws. Tractors and transfer trailers shall be <br />painted in a uniform color scheme approved by the AUTHORITY and shall <br />prominently display an AUTHORITY service mark (logo), the design and <br />placement of which are subject to AUTHORITY approval. <br /> <br />3) Contractor shall furnish backup, substitute or replacement equipment <br />necessary to continue uninterrupted operations, transfer and disposal when <br />equipment regularly in service is inoperable or unavailable. <br /> <br />4) Contractor shall use blade guards and rubber tires on all mobile equipment <br />operated in and around the tipping floor of the MRF and transfer station and <br />shall use due care in their operation to avoid damaging the tipping floor. <br /> <br />5) Contractor shall follow manufacturers' guidelines for equipment use and <br />equipment manufacturers warranties. Any costs that arise from voided <br />equipment warranties (voided as a result of the Contractor not providing <br />proper equipment care as specified by the manufacturer) will be the <br />responsibility of the Contractor. <br /> <br />T. Cleanina. Contractor shall maintain all properties, facilities and equipment used <br />in providing service under this Agreement in a safe, clean, neat and operable <br />condition at all times. Tractors and transfer trailers shall be thoroughly washed <br /> <br />Facility Agreement, Attachment 3 <br />General Operating Standards and Procedures <br />Page 3 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.