My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />on the exterior at least once every week and thoroughly cleaned with pressurized <br />hot water at least once per year. Building office areas shall be cleaned daily. <br />Work areas within buildings and structures shall be swept daily and washed twice <br />weekly. The refuse transfer truck loading area shall be cleaned and swept at the <br />end of each operating day. Transfer station tunnels will be washed daily and all <br />materials and debris will be cleaned from the tunnels. Tunnel sumps will be <br />maintained so that no standing water is present within the transfer station <br />tunnels. The transfer and MRF buildings shall be thoroughly cleaned inside and <br />out with water at least once per year and once immediately prior to expiration of <br />the Term of this Agreement. <br /> <br />Solid Waste may not be left on the tipping floor for more than 24 hours or as <br />otherwise required by regulatory agencies. Solid Waste shall be removed to the <br />Designated Disposal Site within 48 hours after its delivery to the Shoreway <br />Center or as directed by the LEA. Wastes shall not be disposed of into storm <br />drains, or into sanitary sewers without proper pretreatment that meets regulatory <br />requirements. <br /> <br />U. Establishment of Vehicles' Tare Weiohts. Before the commencement of service, <br />Contractor shall provide the AUTHORITY with a copy of its standard <br />methodology for determining tare weights for AUTHORITY's review and <br />approval. Contractor shall modify its standard methodology if requested to do so <br />by AUTHORITY. Before the commencement of service, the Contractor shall <br />weigh each Collection Contractor vehicle, which may be used to deliver Materials <br />to the Shoreway Center, to determine their unloaded ("tare") weights. Vehicles to <br />be weighed include, but are not limited to, front, side and rear loaders, roll-off <br />trucks, street sweepers, recycling trucks, pickup trucks, vans and trucks and <br />trailers. In addition, during the same period of time, Contractor shall weigh each <br />transfer trailer. The tare weight of each vehicle shall be provided to the <br />AUTHORITY and Collection Contractor along with the vehicle number within <br />thirty (30) days after each vehicle is weighed. Contractor shall be responsible for <br />coordinating the weighing of vehicles with AUTHORITY, the Member Agencies <br />and their Collection Contractor. <br /> <br />1. When additional or replacement vehicles are placed into service by the <br />AUTHORITY, other Member Agencies or their Collection Contractor and <br />when the Member Agencies change their Collection Contractor, the <br />Contractor shall promptly weigh such additional and replacement vehicles <br />and the vehicles of the new Collection Contractor and provide the tare <br />weights to the AUTHORITY within thirty (30) days after the vehicles are <br />weighed. <br /> <br />2. Contractor shall conduct random or specific re-weighing of all vehicles if <br />requested in writing by AUTHORITY of all vehicles delivering materials to the <br />Shoreway Center or delivering materials to the Designated Disposal Site and <br />Processing Facilities. Vehicles shall be reweighed by Contractor, at <br />AUTHORITY's request, within one (1) week after AUTHORITY delivers a <br />written request to do so. Adjusted tare weights shall be furnished to the <br />AUTHORITY within thirty (30) days after re-weighing. <br /> <br />Facility Agreement, Attachment 3 <br />General Operating Standards and ProcedurestPage 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.