My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />V. Paintina. Contractor's vehicles shall be repainted and/or refurbished so that they <br />present an acceptable appearance in the opinion of the AUTHORITY. The <br />frequency of painting shall be on an as-needed basis but no less than once every <br />4 years. The type of paint, color and method of application shall be submitted to <br />the AUTHORITY for review and approval prior to commencement of repainting <br />work. <br /> <br />W. Maintenance and Repair. <br /> <br />1) AUTHORITY's Obligations. The AUTHORITY shall maintain in good <br />condition the roofs, structural portions and exterior walls (but not plate glass, <br />glass windows, window frames, doors and door frames, which are the <br />responsibility of the Contractor), and paved areas, unless such maintenance <br />and repair becomes necessary in whole or in part due to acts of Contractor, <br />in which case the Contractor shall pay AUTHORITY the reasonable cost of <br />such maintenance or repair. <br /> <br />a) AUTHORITY shall pay for repairs or replacement to stationary equipment <br />when the expense of the repair or replacement (a single item not a <br />combination of items) exceeds a dollar cost (total of labor, parts and <br />materials) over $10,000. For example, if there is an equipment repair that <br />exceeds $10,000 in cost (including labor, parts, and materials), the <br />Contractor is to pay for the repair expenses up to $10,000; and the <br />AUTHORITY shall pay the repair or replacement cost in excess of <br />$10,000. <br /> <br />b) The AUTHORITY shall repair or replace at its sole expense, if and when <br />necessary, the Shoreway Center tipping floor areas, unless the repair is <br />the result of damage caused by improper use or negligence by the <br />Contractor. <br /> <br />2) Contractor's Obligations. Contractor shall keep and maintain in good, safe <br />condition and repair the Shoreway Center, appurtenances and every part <br />thereof, including without limitation the stationary equipment, such as <br />conveyors, MRF processing equipment, balers, shredders and screens; <br />plumbing and sewage facilities; mechanical, electrical, lighting, heating, <br />ventilating and air conditioning systems; fire and dust suppression systems; <br />fuel storage and dispensing facilities; scales, and all personal property <br />furnished by Contractor including vehicles. Contractor shall repair any <br />damage to any facilities caused by the actions of its employees, <br />subcontractors or other agents. <br /> <br />Contractor shall perform periodic maintenance on all stationary equipment in <br />accordance with applicable manufacturer's specifications and schedules so <br />as to maintain in force any manufacturer's/vendor's warranties. <br />AUTHORITY will assist Contractor in securing manufacturer's/vendor's <br />repair and replacement of equipment due under warranties (if any) provided <br />to AUTHORITY in connection with the purchase of stationary equipment. <br /> <br />Contractor shall be responsible for securing replacement parts (and for <br />maintaining an inventory of spare parts) for all stationary equipment and for <br />facilities which the Contractor is required to maintain and repair. During <br />periods that warranties are in effect for equipment, Contractor shall use only <br />parts supplied by the original equipment manufacturers to replace worn or <br /> <br />Facility Agreement, Attachment 3 <br />General Operating Standards and Procedures <br />Page 5 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.