My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 South Bay Recycling, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 South Bay Recycling, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2009 10:33:57 AM
Creation date
8/31/2009 11:36:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bay Recycling, LLC
PROJECT NAME
Operation of Shoreway Recycling and Disposal Center
RMP File Number
304
Date
7/30/2009
Reso Ref
14964
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 5.19 <br />28 <br />29 <br />30 <br />31 <br /> <br />Authority approves, in writing and in advance, a beneficial landfill use for diverted tons. <br />Loads rejected by an off-site processor because of contamination will not count <br />towards Self-haul Diversion and the Contractor shall pay all costs of managing <br />rejected loads. <br /> <br />D. Self-haul Diversion Report. Contractor shall provide the Authority a Self-haul <br />Diversion Report including the following information: the amount of Self-haul material <br />received, the weight all Self-haul materials processed on-site or transported to the <br />Designated Site, the method of materials processing, and the weight and disposition of <br />all materials Diverted. The Contractor shall provide the report monthly (no later than 15 <br />days after the end of each month) in a format to be approved by the Authority. <br /> <br />E. Optional Transfer Station Processina System. On or before June 30, 2010, <br />Contractor shall submit to the Authority a proposal to install a materials processing <br />system in the Transfer Station. The system is to be capable of accepting and efficiently <br />processing Self-haul construction/demolition debris (wood, concrete, insulation, roofing, <br />metals, drywall, dirt and other inerts) and Organic Materials (including Plant Materials <br />and wood waste). The system shall be capable of operating at a cost per Ton <br />(including capital costs amortized as provided in Attachment 12) which is equal to or <br />less than the current total cost of transporting construction and demolition debris to the <br />existing off-site facility used by the Authority and the payment to the operator of that <br />facility for processing. The proposal shall include plans and specifications for the <br />equipment, cost forms showing estimates for design, equipment purchase, installation <br />and operation, and a detailed operational plan. <br /> <br />The Authority will carefully evaluate the proposal, but is under no obligation to approve <br />it nor arrange for or permit the installation of such a processing systems. <br /> <br />The Contractor is responsible for the cost of preparation and submission of the proposal <br />and will not receive any additional payment for it. <br /> <br />OTHER OPERATING PROCEDURES AND STANDARDS <br /> <br />Contractor shall conduct its operations in accordance with the requirements of the <br />California Integrated Waste Management Board in effect (as codified in Title 14 and Title 27 <br />of the California Code of Regulations) as of the Effective Date and as they may be changed <br />from time to time. <br /> <br />Operating Agreement for Shoreway Center <br /> <br />Page - 20 - <br /> <br />7/30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.