Laserfiche WebLink
<br />1 <br /> <br />ARTICLE 6 TRANSPORTATION OF MATERIALS. <br /> <br />2 6.01 GENERAL <br />3 Contractor shall use due care to prevent materials being transported from being spilled <br />4 or scattered during transport. If any materials are spilled, Contractor shall at its sole <br />5 expense clean up all spilled materials, whether on private or public property. <br /> <br />6 6.02 TRANSPORTATION OF SOLID WASTE <br />7 Contractor shall transport and deliver to the Designated Disposal Site all Solid Waste <br />8 that is not recycled or reused. No Solid Waste may be disposed of at any location other <br />9 than the Designated Disposal Site without written consent from the Authority. <br /> <br />10 6.03 TRANSPORTATION OF HAZARDOUS SUBSTANCES <br />11 Contractor shall provide or arrange for transportation and delivery to an appropriately <br />12 permitted disposal facility of any Hazardous Substances that are not discovered by the <br />13 Contracfor through the hazardous waste exclusion program (HWEP) or which are <br />14 rejected by the operator of the Designated Disposal Site or any designated Processing <br />15 Facility. <br /> <br />16 6.04 TRANSPORTATION OF RECYCLABLE MATERIALS <br />1 7 A. Sinale Stream Recvclable Materials. Contractor shall provide or arrange for <br />18 transportation and delivery of all Single Stream Recyclable Materials to a purchaser, <br />19 a licensed recycling facility, or a person who will use the materials in a process or <br />20 product and will not dispose or use them at a landfill. <br /> <br />21 <br />22 <br />23 <br />24 <br />25 <br /> <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br /> <br />B. Transfer Station Materials. Contractor shall provide or arrange for transportation to a <br />Designated Processing Facility of Organic Materials, C&D materials, and other <br />Recyclable Materials delivered to and recovered at the Transfer Station. These <br />materials shall be prepared and delivered in a condition and form which meet the <br />Designated Processing Facilities' specifications and receiving requirements. <br /> <br />C. E-Waste. U-Waste. and Appliances. Contractor shall supply storage containers for, <br />and arrange for the transportation of, E-Waste, U-Waste, appliances and other <br />materials that may be added to the list of Buy Back/Drop-off Center material. At the <br />request of the Authority, Contractor will pay the cost of transporting these materials. <br />The handling/disposal costs incurred by Contractor for the use of outside vendors in <br />the transportation and processing of special wastes collected in the Buy back/Drop- <br />off Center (e.g., Electronic waste, Universal waste, and batteries, oil, and paint <br />collected from Customers as part of the services to Member Agencies) and for the <br />handling and processing of appliances will be reimbursed as a Pass-Through Cost. <br /> <br />35 6.05 PARKING AND MAINTENANCE OF TRANSFER VEHICLES <br /> <br />36 Contractor shall park empty Transfer Vehicles at the Shoreway Center in the area( s) <br />37 designated for this purpose shown on Attachment 5. Transfer Vehicles containing Solid <br />38 Waste shall be parked in areas that prevent liquids that have come in contact with Solid <br />39 Waste and/or Recyclable Materials from entering the storm water system. In addition, <br />40 Contractor shall use due care generally to prevent liquids that have come in contact with <br />41 Solid Waste and/or Recyclable Materials from entering the storm water system. <br /> <br />Operating Agreement for Shoreway Center <br /> <br />Page - 21 - <br /> <br />7/30/09 <br />