Laserfiche WebLink
6.E. AFi N,3' 18f Iepoint Services _ _ Exhibit B —'RFP Requirements <br />8. ConserveTrack -- one way from ConserveTrack to TrueBill. <br />9, Waterfluence -- TruePolnt will configure an export using our standard Import/Export Companion which <br />will allow monthly reporting of irrigation account. information to Waterfluence. <br />10, Smart Energy Water (SEW) -- BI -directional Interface using TruePoint's standard Import/Export <br />Companion. <br />11, Hyperweb — Bi-directional interface using TruePoint's standard Import/Export Companion <br />12. Recology — Bi-directional interface using TruePoint's standard Import/Export Companion. <br />13. Worm Management -- TruePoint wll l work with Redwood City's technical team to develop a bi- <br />directional integration with their existing work management system, Hiperweb. <br />14. Cashiering — TruePoint will work with Redwood City's technical team to develop a bi-directional <br />integration with their existing Legacy Systems Cashiering system or CoreBT Cashiering system, <br />whichever Is being used at the time of Tru.eBill implementation. CoreBT Is the cashiering 'system being <br />Implemented as part of the new ERP expected to go -live In July 2020. Should the CoreBT Cashiering <br />system go live afterthe TruePolnt project completes and require a different Integration (method or file <br />type), a change order would be required for the additional effort. Although it is acceptable for the <br />Integration with the current cashiering system to be batch updated, intervals to be determined, the <br />Integration with CoreBT` must be real-time. <br />15. Environmental Systems Research Institute (SSRI) — BiAlrectional integration between TrueBill and the <br />SSRI ArcGIS system. <br />Truell Tint Responsibilities <br />• Provide timely and appropriate responses to Redwood City's request for information. <br />• Assign and schedule appropriate TruePoint resources. <br />• Lead the development of the interfaces, <br />• Develop interface specifications documents. <br />• Assist Redwood City in troubleshooting any issues found in the functional testing of the Interfaces, <br />Redwood City Responsibilities <br />Provide timely and appropriate responses to TruePoinfs request for Information. <br />• Oversee the functional testing of the interfaces. <br />• Allocate the time for qualified personnel to test and verify the interfaces. <br />• Allocate the time for qualified business and technical experts for the interface requirements sessions <br />that are critical to the project success_ <br />Phase 7. Report Development <br />Duration; Approximately 3 Weeks --120 Hours <br />Definition; <br />This service consists of TruePolnt consultation for Report Development; Reports are an Integral part of the <br />TruePoint solution, <br />There are limited hours for Report Development (includes requirements, design, development, testing). For <br />standard accounting and usage tracking, TruePoint will provide ample standard "off the shelf' reports as <br />described In. Exhibit E TrueBill .Standard Reports. However, as part of this contract, TruePoint will develop to <br />City's satisfaction a set of agency specific reports which Includes the following; Bill Output (for InfoSend), <br />REV: 04-23-19 Phi <br />Page 16 of 64 <br />M'Requirements Page 16 <br />ATTWAGR.2019.1061TruePoint TrueBill Utility Billing System 123 <br />