My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.03.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.03.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 12:21:02 PM
Creation date
3/18/2021 4:58:35 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
3/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
546
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From: <br />Subject: Meeting Agenda 20210319 - Bike/Ped Plan and Vision Zero <br />Date: Saturday, March 20, 20217:06:44 PM <br />CAUTION: This email originated from outside your organization. Exercise caution when <br />opening attachments or clicking links, especially from unknown senders. <br />Dear Council Member, <br />let's do a quick review of the upcoming council meeting on 03/22. <br />Consent Calendar 6.B. Award contract to Fehr & Peers for the Citywide Bicycle and Pedestrian <br />Master Plan and the Vision Zero Action Plan for $180,000. <br />Vision Zero: America's bike/ped mode share is too small to make Vision Zero work around here. <br />This has lead to racial equity problems all over the US. <br />Racial Equity groups and real bicycle advocates have already come out against its built-in racial <br />bias. <br />The VisionZeroNetwork tries to distance itself from its racial problem, but <br />can't: https://visionzeronetwork.oro/acting-for-racial-justice-just-mobility_[ <br />Racial Equity in this case means to stay away from Vision Zero and start embracing "Complete <br />Streets". And this time with more commitment. <br />The city does not need another bicycle or pedestrian plan, the city already has many, many out <br />there: <br />• 1964: San Mateo County Plan for 1990 <br />1971: San Mateo County formed a Bikeways Committee in 1971 to coordinate the <br />development of a countywide bikeways system. <br />1976: The County adopts a County Bikeways Plan prepared by the Committee <br />• 1986: San Mateo County General Plan - The Department of Environmental Management of <br />San Mateo County asks all Cities to build more bike lanes, because bike lanes are the future. <br />• 1999: San Mateo Countywide Transportation Plan (C/CAG) <br />. 2000: San Mateo County Comprehensive Bicycle Route Plan (CBRP) - The County tells RWC <br />to "Develop and maintain a bicycle transportation system that encourages the use of bicycles <br />as a safe, efficient, and convenient alternative to the automobile." The County especially <br />mentions North-South connector Alameda De Las Pulgas. <br />. 2001: C/CAG adopted the "Countywide Transportation Plan 2010", which asks the Council to <br />"Develop a bikeway system which is fully integrated with other transit modes (i.e. connection <br />to Caltrain, bicycle lockers) <br />• 2008: Redwood City General Plan Transportation and Circulation Technical Report (Fehr & <br />Peers) <br />• 2010: RWC's own plans asks the Council to develop the Hetch Hetchy Right of Way into a <br />recreational bike/ped path. It also recommends real Bike Blvd. on Vera, Myrtle and Brewster <br />and of course bike lanes on Alameda. <br />. 2011: C/CAG publishes the "San Mateo County Comprehensive Bicycle and Pedestrian Plan" <br />(CBPP), which is the San Mateo Bicycle Bible ever since (Alta, Fehr & Peers) <br />• 2013: Peninsula Congestion Relief Alliance annual reports <br />. 2013: Redwood City Climate Action Plan (cancelled prematurely in 2019) says "Complete the <br />bikeways identified for Redwood City in the San Mateo County Comprehensive Bicycle and <br />Pedestrian Plan and increase local bikeways" Also add bike lanes and bike parking. <br />• 2014: C/CAG SRTS 5 -year evaluation <br />. 2016: C/CAG Countywide Transportation Plan tells the Council: "A significant obstacle to <br />bicycle use is that bicycle facilities have been created over time in a somewhat piecemeal <br />and uncoordinated fashion, resulting in gaps and lack of continuity in the bikeway <br />network. <br />• 2017: RWCMoves - with "RWC Moves" the City told itself to finally finish the following bike <br />lane projects: Oak (10), Vera (14), Brewster (15), Alameda de Las Pulgas Bike Lanes on its <br />entire length (17), Myrtle, Bay -to -Sea Trail etc. <br />. 2020: Redwood City Climate Action Plan Update (currently regarded as a failure) says more <br />bike lanes, but city manager doesn't do it. <br />. 2020: SMC Active Transportation Plan (regarded as a failure) says more bike lanes, but city <br />
The URL can be used to link to this page
Your browser does not support the video tag.