My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2009 9:49:22 AM
Creation date
9/8/2009 9:49:21 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
San Carlos Airport Levee Project
RMP File Number
304
Date
9/1/2009
MO Ref
09-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I~~ <br />II- <br />BkF <br /> <br />APPROACH <br /> <br />EXHIBIT A - SCOPE OF WORK <br /> <br />Exclusions <br /> <br />The following are excluded from BKF's scope of services: <br /> <br />Attending meetings in addition to those listed under each Task. Additional meetings will be <br />charged as an additional service on a time and materials basis. <br /> <br />Major revisions to work or drawings that are substantially complete, provided such <br />revisions are not caused by the actions of BKF are excluded. <br /> <br />Geotechnical Engineering beyond those services specifically included in this proposal, <br />utility potholing, and environmental reviews are excluded from this Scope of Services. <br /> <br />The City will provide the Initial Studies for CEQA documents and any other required <br />environmental clearance. BKF will provide necessary project descriptions or exhibits for <br />environmental studies as needed on a time and materials basis as an additional service. <br /> <br />Landscape plans and vegetation restoration planting plans are excluded. <br /> <br />Locating property lines, right-of-way, or easement areas are excluded. Land and easement <br />acquisition services are excluded from this scope of services. <br /> <br />Permit coordination and costs including California Water Quality Control Board, <br />California Department of Fish and Game and United States Army Corps of Engineers. <br /> <br />Modifications to outfalls are excluded from this scope. If we fmd that outfalls require <br />modification during our design, we can provide a proposal for those additional services. <br /> <br />Levee crest elevation certification is excluded. We assume ENGEO or others will be <br />responsible for the certification at a later date. <br /> <br />Construction staking and geotechnical services during construction are not included. A <br />proposal for this work can be provided at a later date once plans have been created. <br /> <br />Reproduction and distribution of bid documents will be done by the City. <br /> <br />Any services not specifically included in the Scope of Services are excluded. <br /> <br />Identification of FAA requirements is excluded. We understand the Airport's consultant <br />will provide the design team with specific FAA requirements pertinent to this project. <br /> <br />Geotechnical Field Exploration is being provided under separate contract. <br /> <br />.- City of Redwood City:'" Redwood'S"hores Levee Improvements -San Carlos Airport Segment <br />Date: July 16,2009 <br /> <br />650.482. 6300 <br />www.bkf.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.