Laserfiche WebLink
<br />.....~ <br />II- <br />BkJ <br /> <br />APPROACH <br /> <br />EXHIBIT A - SCOPE OF WORK <br /> <br />Consultation with project team during design phase: <br /> <br />- Provide consultation and attend project team meetings during design phase <br />- Provide review of construction documents <br /> <br />Task 3. Levee Crest Elevation As-Built <br /> <br />Task 3a. <br /> <br />As-built Drawing <br /> <br />A post-construction GPS survey of the levee will be provided to the City for certification <br />by others. At this time, we do not know the survey requirements for FEMA certification; <br />however, we assume GPS survey shots of the levee crest at approximately 200-foot <br />intervals, similar to the existing conditions survey, may be sufficient for this use. <br />Additional GPS shots will be taken at the base of the wall near the library. If additional <br />survey work is required for certification, we will provide a proposal for those additional <br />services. Limits of the survey will be the same as the area of proposed improvements. <br /> <br />Deliverables: <br /> <br />Three (3) copies of Full Size, signed and stamped survey. <br /> <br />-City of Redwood "Ci"ty":' Redwood Shores Levee Improvements - San CarlosA"il"portSegmer;t <br />Date: July 16, 2009 <br /> <br />650.482. 6300 <br />www.bkf.com <br />