My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2009 9:49:22 AM
Creation date
9/8/2009 9:49:21 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
San Carlos Airport Levee Project
RMP File Number
304
Date
9/1/2009
MO Ref
09-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I~ <br />II- <br />BkF <br /> <br />APPROACH <br /> <br />EXHIBIT A - SCOPE OF WORK <br /> <br />Task 2b. <br /> <br />Supplemental Survey <br /> <br />Existing survey from the County LiDAR 2-foot contour AutoCAD drawing, County field <br />survey of levee crest edge of pavement, City of San Carlos AutoCAD drawings will be <br />used as a background for construction documents. Supplemental field survey will be <br />performed for the segments within the City of San Carlos on both sides of the airport. <br /> <br />Task 2c. <br /> <br />Preliminary Construction Documents <br /> <br />Preliminary construction documents will be prepared for the improvements to the levee. <br />We assume drawings will be at 100-scale. The plans will utilize existing City standard <br />details as appropriate. Caltrans and "Green Book" standard details will be used where City <br />standard details are not appropriate. Technical specifications will be provided separately <br />from the plans, as appropriate. The City will prepare the general specifications and include <br />the technical specifications into one specification book. <br /> <br />Design review meetings are included for the 80% submittals. Construction cost updates <br />will be provided for this submittal. <br /> <br />Deliverables: <br /> <br />80% Plans, Specifications and Cost Estimates will be provided to the City. <br /> <br />Task 2d. <br /> <br />Incorporate City Comments and Provide 1000/0 Submittal <br /> <br />City comments will be incorporated into a 100% Submittal that includes Plans and an <br />Engineer's Opinion of Probable Construction Cost. Specifications will be included on the <br />plans as needed. <br /> <br />Deliverables: <br /> <br />Three (3) copies of Full Size 100% Plans. The Plans will also be provided in electronic <br />format as using the .PDF format. <br /> <br />Task 2e. <br /> <br />Assistance during Construction <br /> <br />Assistance will be provided during the construction process including shop drawing <br />review, response to RFI's, and one site visit to prepare the punch list. <br /> <br />Attendance at the preconstruction meeting is excluded. <br /> <br />Task 2f. <br /> <br />Geotechnical Services <br /> <br />Please refer to the attached proposal from ENGEO for additional detail. <br /> <br />-CityoTRedwoodCity - REJdwood~Shores Levee Improvements - San Carlos Airport Segment <br />Date: July 16, 2009 <br /> <br />650.482. 6300 <br />www.bkf.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.