My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2009 9:49:22 AM
Creation date
9/8/2009 9:49:21 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
San Carlos Airport Levee Project
RMP File Number
304
Date
9/1/2009
MO Ref
09-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P2009.000.164 <br />BKF Engineers April 15, 2009 <br />Levee Improvements Adjacent to ,the San Carlos Airport Latest Revision June 30, 2009 <br />PROPOSAL FOR GEOTECHNICAL EXPLORATION SERVICES - PHASE 2 Page 3 <br /> <br />requested in providing geotechnical input to project specifications and in determining unit costs <br />for engineering cost estimates. <br /> <br />It is understood the City of Redwood City will limit ENGEO's and BKF Engineers' liability for <br />damage due to professional negligence, acts, errors, omissions, breach of contract and <br />consequential damages to an amount not to exceed an aggregate limit of $1,000,000. <br /> <br />SCHEDULE <br /> <br />Provided the field work included in Phase 1 has been completed, we expect that our Phase 2 <br />services will commence immediately following your authorization and receipt of an agreement. <br />The time to complete all portions of the geotechnical study including laboratory testing, analysis, <br />and report preparation will be approximately 4 weeks from completion of the field work or <br />Phase 2 authorization, whichever occurs latest. <br /> <br />FEE ESTIJ\.1A TE <br /> <br />We will provide our Phase 2 services to develop a geotechnical report providing conclusions, <br />analysis, and recommendations for the proposed levee raise alternatives on a time-and-expense <br />basis in accordance with our current fee schedule for an approximate fee of $31,150. If the <br />scope and duration of these services change, a revision to our fee estimate may be required. We <br />also suggest establishing a separate design-support consultation budget of $10,000 for <br />as-requested consultation, reviews, and attendance at project team meetings; these <br />design-support fees will also be invoiced on a time-and-expense basis in accordance with our <br />current fee schedule. <br /> <br />We look forward to providing services to you on this project. If you have any questions <br />regarding the scope of our services, please do not hesitate to contact us. <br /> <br />Very trol Y yours, <br /> <br />ENGEO Incorporated <br /> <br /> <br />~ C--=- <br />Ben~a,pp <br />Project Engineer <br />bs/jamlrc <br />
The URL can be used to link to this page
Your browser does not support the video tag.