My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Abey Arnold Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 Abey Arnold Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2010 2:03:26 PM
Creation date
9/10/2009 12:40:58 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Abey Arnold Associates
PROJECT NAME
Landscape Architecture Services
RMP File Number
304
Date
9/9/2009
MO Ref
Amendment 10-227
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT -A <br /> <br />Janet Hansen <br />City of Redwood City <br />Parks, Recreation & Community Services Dept. <br />1400 Roosevelt Ave. <br />Redwood City, CA 94061 <br /> <br /> <br />..J <br /> <br />C T ~. <br /> <br />August 12,2009 <br /> <br />RE: 3 PLAY AREAS DESIGN <br /> <br />Dear Janet: <br /> <br />The following is our fee proposal for the play areas at the Fair Oaks <br />Infant/Preschool Childcare Facility, Dove Seeger Park and Westwood Park. <br />Work will include public outreach, design, construction documents and <br />construction observation. <br /> <br />We are anticipating having the Fair Oaks Infant/Preschool Childcare as one <br />project for bidding and installation, and, Dove Seeger and Westwood Park as a <br />second combined project for bidding and installation. Each site will be treated <br />as separate projects during the outreach and communication process with the <br />community. This will help focus each neighborhood on their respective play <br />areas. <br /> <br />Project Summary: <br /> <br />1 . Fair Oaks Infant/Preschool Childcare Play Area <br />· Anticipated installation and soft costs: $125,000. <br />. Replace existing climbing structure. <br />. Modify or replace sand play area for better accessibility. <br />· Meet with on-site childcare staff to clarify design elements. <br />· Work toward keeping existing shade trees and incorporate into <br />design. <br /> <br />2. Dove Seeger Park Play Area <br />· Anticipated installation and soft costs: $185,000. <br />. Replace existing play structures. <br />. Layout accessible pathway to play area. <br />. Add picnic tables near play area. <br />· Keep play area at back of site for maximum grass turf open play area. <br />· Consider one climbing structure for 5-12 year old users. <br /> <br />3. Westwood Park Play Area <br />· Anticipated installation and soft costs: $125,000. <br />· Replace existing play structures. <br />· Layout accessible pathway to play area. <br />. Add picnic tables near play area. <br />· Keep play area at back of site for maximum grass turf open play area. <br />. Consider one climbing structure for 2-5 year old users. <br />. Smaller sand play area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.