My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Abey Arnold Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 Abey Arnold Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2010 2:03:26 PM
Creation date
9/10/2009 12:40:58 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Abey Arnold Associates
PROJECT NAME
Landscape Architecture Services
RMP File Number
304
Date
9/9/2009
MO Ref
Amendment 10-227
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Scope of Work and Fee: <br /> <br />Work Task <br /> <br />Fee <br /> <br />FAIR OAKS INFANT/PRESCHOOL CHILDCARE PLAY AREA: <br /> <br />I. Existing Conditions and Topographic Survey <br />A. Generate existing conditions and topographic survey for <br />use as a base for all design and drawings. <br />B. Property line boundary survey not included. <br /> <br />II. Conceptual Design <br />A. Meet with on-site childcare staff (3 meetings) <br />B. Generate Concept plan for childcare and Park and <br />Recreation Staff review and approval. <br />C. Generate Concept Plan Opinion of Probable Installation <br />Costs. <br />D. Present Concept Plan to Neighbors and Parks and <br />Recreation Commission. <br /> <br />III. Construction Documents <br />A. Layout and details. <br />B. Grading drainage and details. <br />D. Planting plan and details. <br />E. Irrigation plan and details. <br />F. Specifications. <br />G. Coordinate with Staff. <br />H. Generate Pre-bid Opinion of Probable Installation <br />Costs. <br /> <br />IV. Bidding Phase <br />A. Assist the City with Clarification of drawings. <br />B. It is anticipated that the City will take the lead in this <br />phase of work. <br /> <br />V. Construction Observation <br />A. Site visits during construction to review progress. <br />Generate field reports. <br />B. It is anticipated that the City will take the lead in this <br />phase of work with all paperwork routed through Staff. <br />C. Drafting of Record set of drawings based on <br />contractor's as-built field plans <br />Sub-Total for childcare site: <br /> <br />DOVE BEEGER PARK AND WESTWOOD PARK: <br /> <br />VI. Existing Conditions and Topographic Survey <br />A. Generate existing conditions and topographic survey for <br />use as a base for all design and drawings. <br />B. Property line boundary survey not included. <br /> <br />Redwood City, 3 Play Areas <br /> <br />$3,000.00 <br /> <br />$4,500.00 <br /> <br />$8,000.00 <br /> <br />$1,000.00 <br /> <br />$2,400.00 <br /> <br />$18,900.00 <br /> <br />$8,000.00 <br /> <br />2of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.