My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Abey Arnold Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 Abey Arnold Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2010 2:03:26 PM
Creation date
9/10/2009 12:40:58 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Abey Arnold Associates
PROJECT NAME
Landscape Architecture Services
RMP File Number
304
Date
9/9/2009
MO Ref
Amendment 10-227
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VII. Conceptual Design <br />A. Meet with neighborhoods separately for each site for <br />input and discussion of the process. <br />B. Generate Concept Plan for each site for Park and <br />Recreation Staff review and approval. <br />C. Generate Concept Plan Opinion of Probable Installation <br />Costs. <br />D. Present Concept Plan to Neighborhoods and Parks and <br />Recreation Commission. <br /> <br />$7,000.00 <br /> <br />VIII. Construction Documents <br />A. Layout and details. <br />B. Grading drainage and details. <br />D. Planting plan and details. <br />E. Irrigation plan and details. <br />F. Specifications. <br />G. Coordinate with Staff. <br />H. Generate Pre-bid Opinion of Probable Installation <br />Costs. <br /> <br />$18,000.00 <br /> <br />IX. Bidding Phase <br />A. Assist the City with Clarification of drawings. <br />B. It is anticipated that the City will take the lead in this <br />phase of work. <br /> <br />$2,000.00 <br /> <br />X. Construction Observation $4,800.00 <br />A. 3 site visits to each park during construction to review <br />progress. Generate field reports. <br />B. It is anticipated that the City will take the lead in this <br />phase of work with all paperwork routed through Staff. <br />C. Drafting of Record set of drawings based on <br />contractor's as-built field plans <br />Sub-Total for two park sites: $39,800.00 <br /> <br />Grand Total fee for all three sites: S5g.700.00 <br /> <br />XI. neimlstlrsebla Cxpel.~lW~ <br />! ^. PAi3eellel.eou5. sl.iPIJ;,.g,. efJ' u. l.,;u::sl::s, tH\.,;. <br /> <br />Co,,,. p,u," I!J~ f~ <br /> <br />All Items will be billed monthly. Any work provided in addition to items above <br />will be billed as extra services at $180.00 per hour for Principal time, $140 per <br />hour for design staff time, $110.00 per hour for drafting staff time, or on an <br />agreed upon lump sum basis. <br /> <br />Redwood City, 3 Play Areas <br /> <br />30f4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.