My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 TetraTech
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 TetraTech
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 8:20:07 AM
Creation date
4/7/2021 8:19:04 AM
Metadata
Fields
Template:
Agreement
Contractor Name
TetraTech
PROJECT NAME
PSA
RMP File Number
304.5
Date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Key CONSULTANT deliverables: The key deliverables to be completed by the CONSULTANT <br />for this phase include: <br />✓ Capability assessment <br />✓ Risk Ranking <br />✓ Facilitate a SWOO session <br />✓ Catalog of mitigation alternatives <br />✓ Prioritized action plan <br />✓ Finalized jurisdictional annex. <br />Phase 3 - Complete Plan Review and Adoption <br />Under this phase, CONSULTANT will facilitate the review and adoption of the plan. This will <br />include presentation of draft versions of the plan to the Steering Committee, preparation of a <br />"public review draft," completion of the plan review crosswalk, support of the adoption process <br />and submittal of final plan package to CalOES for review and approval. The tasks to be completed <br />under this phase are as follows: <br />Task 3A- Complete Plan review Crosswalk: Once the final draft plan has been prepared, and all <br />public and Steering committee comments have been incorporated into the final draft, <br />CONSULTANT will complete a FEMA plan review crosswalk to illustrate the plan's compliance <br />with 44 CFR Section 201.6. A draft plan will then be forwarded along with the completed <br />crosswalk to CalOES with a request for "pre -adoption" review and approval. <br />Task 3B- Plan adoption support: Once the final draft has been completed, the adoption phase of <br />the planning process will begin. The CITY will be provided an adoption package that includes <br />sample resolution, staff report and a copy of the executive summary. CONSULTANT will prepare <br />a standardized power point presentation that can be utilized by the CITY in its presentation <br />Council. <br />Key CONSULTANT deliverables: The key deliverables to be completed by the CONSULTANT <br />for this phase include: <br />✓ Completion of the plan review crosswalk <br />✓ Transmittal of the draft plan to CalOES with request for pre -adoption review <br />✓ Example model resolutions and instructions provided to planning partner <br />✓ Production of a standardized power point presentation to be used by planning partners <br />during their adoption processes. <br />Phase 4- Project Management <br />This phase will be dedicated to the overall project management for this project, including but not <br />limited to project coordination, work scheduling, product review and certification, budget and <br />expenditure management, invoicing, and issue resolution. CONSULTANT will provide a <br />summary document of deliverables with each invoice. Final invoice will be submitted when <br />"approval pending adoption" (APA) has been issued by FEMA region IX. <br />REV: 03-25-2021 RL <br />ATTY/AGR.2021.045/Tetra Tech, Inc (HMP Annex Work) (Page 13 of 14) <br />
The URL can be used to link to this page
Your browser does not support the video tag.