My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.04.26 Joint SA FPA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.04.26 Joint SA FPA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 9:23:20 AM
Creation date
4/22/2021 4:50:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. - Page 22 of 145 <br />Attachment A <br />Item Description Qty <br />91. Install Verizon Connect GPS with DAC Data for California HVIP (Telogis) (Third Party 1 <br />Supplier) <br />92. No Upper Boom Out of Stow Indicator 1 <br />93. No Lower Boom Out of Stow Indicator 1 <br />94. PTO Indicator Light Installed In Cab 1 <br />Finishina Details <br />95. Powder Coat Unit White 1 <br />96. Standard; Components mounted below frame rail shall be coated black by Manufacturer. 1 <br />i.e. step bumpers, steps, frame extension, pintle hook mount, dock bumper mounts, <br />D -rings, receiver tubes, accessory mounts, light brackets, under -ride protection, etc. <br />Components mounted to under side of body shall be coated black by Manufacturer. <br />i.e. Wheel chock holders, mud flap brackets, pad carriers, boxes, lighting brackets, <br />steps, and ladders. <br />97. <br />Apply Non -Skid Coating to all walking surfaces 1 <br />98. <br />Greenfleet Decals, Hybrid Decal Kit 1 <br />99. <br />English Safety And Instructional Decals 1 <br />100. <br />Vehicle Height Placard - Installed In Cab 1 <br />101. <br />Placard, HVI-22 Hydraulic Oil 1 <br />102. <br />Dielectric test unit according to ANSI requirements. 1 <br />103. <br />Stability test unit according to ANSI requirements. 1 <br />104. <br />Focus Factory Build 1 <br />105. <br />Delivery of Completed Unit 1 <br />-Redwood City, CA <br />106. <br />Inbound Freight 1 <br />107. <br />Installation - LR7-60RM Aerial Device 1 <br />108. <br />JEMS LE Hybrid System Installation 1 <br />Hybrid <br />109. JEMS LE 1 <br />A. JEMS LE will automatically shut off the engine to prevent vehicle idle if the <br />integral safety interlocks are met: 1) Vehicle transmission is in park / neutral 2) <br />Parking brake is satisfied (for chassis equipped with air -brakes) 3) JEMS <br />Disconnect is not engaged. Interlocks will prevent the engine from automatically <br />Page 19 of 23 <br />Bidder's Initials_ <br />193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.