Laserfiche WebLink
6.1._- Page 81 of 145 Attachment B <br />Item <br />3. Pedestal <br />Description <br />4. Single 1 -Man Platform, 24 x 24 x 39, Side Mount, 90 Degree Rotation, Hydraulic <br />Platform Tilt, Shaft -Mounted Controls <br />5. One (1) Platform Step - located on the side of the platform nearest the elbow in the <br />stowed position <br />6. Platform Cover - Soft vinyl 24 x 24 inch (610 x 610 mm) <br />7. Platform Liner, 24 x 24 x 39 inches (610 x 610 x 991 mm), 50 kV Rating <br />8. Hydraulic Tool Circuit at Platform: Two (2) sets of tool couplers for open center tools, <br />located on the side of the platform nearest the elbow in the stowed position. <br />9. Hydraulic Tool Circuit Below Rotation: One set of quick disconnect couplings and <br />control valve for open center tools below rotation. <br />10. Engine Start/Stop & Secondary Stowage System: 12 VDC powered motor and pump <br />assembly for temporary operation of the unit in a situation wherein the primary hydraulic <br />source fails. Electric motor is powered by the chassis battery, This feature allows the <br />operator to completely stow the booms, platform, and outriggers. Secondary Stowage & <br />Start/Stop is activated with an air plunger at the platform or momentary switch at the <br />lower control station and outriggers. <br />11. Slip Ring: Required for engine start/stop, secondary stowage system, and throttle control <br />options <br />12. Primary A -Frame Outriggers with 5 -degree swivel shoe. For installation on a 36 to 40 <br />inch chassis frame height. <br />A. Maximum Spread: 140 inches to the outer edge of shoes <br />B. Ground Penetration: 7 to 11 inches depending on chassis frame height <br />C. OutriggerlUnit Selector Valve: reduces the potential for inadvertent outrigger <br />movement during machine operation if outrigger controls are bumped <br />D. Outrigger Control Valves: located on the outrigger legs <br />E. Outrigger Interlocks: will not allow the unit to be operated until the outriggers <br />have been at least partially deployed <br />F. Outrigger Motion Alarms <br />13. Auxiliary Modified A -Frame Outriggers with fixed shoe. For installation on a 36 to 40 <br />inch chassis frame height. <br />A. Maximum Spread: 105 inches to the outer edge of shoes <br />B. Ground Penetration: 7 to 11 inches depending on chassis frame height <br />C. Outrigger Interlocks. will not allow the unit to be operated until the outriggers <br />have been at least partially deployed <br />D. Outrigger Motion Alarms <br />14. Hydraulic Outrigger Control Valves <br />15. Insulating Aerial Device, ANSI Category C, 46kV and Below <br />16. Heavy Duty Upper Boom Cylinders <br />Page 14 of 23 <br />Bidder's Initi s <br />QtY <br />252 <br />