Agmt21 Kimley-Horn - Roosevelt Quick-build Traffic Calming Project PSE
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Kimley-Horn - Roosevelt Quick-build Traffic Calming Project PSE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 9:48:02 AM
Creation date
6/17/2021 9:47:54 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kimley-Horn and Associates, Inc.
PROJECT NAME
transportation planning and engineering firm
RMP File Number
304
Date
5/10/2021
MO Ref
21-061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 04-08-2021 RL <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />Task 1 – Project Management and Administration <br />1.1. Meetings and Project Coordination <br />Within 10 days after the contract execution, Consultant shall attend the virtual kick-off <br />meeting with City staff. Consultant shall participate in bi-weekly meetings or conference <br />calls with the City to discuss project issues, status, and action items. Based on the project <br />schedule, there will be about 14 bi-weekly meetings. Consultant shall prepare meeting <br />agenda and post meeting notes for check-ins. <br />Consultant shall coordinate with the City during the life of the project to discuss specific <br />project related items including design, standards, and policies. <br />1.2. Project Administration <br />Consultant shall set up and manage the project data sharing platform (ShareFile or <br />Microsoft OneDrive) for the project’s needs. This includes timely milestone uploads and <br />management of all electronic files for reference or distribution. This task includes <br />performing quality control and quality assurance of all milestone deliverables prior to <br />submittal and conformance to federal, state, and City standards. <br />Consultant shall submit monthly invoices and progress reports to the City and shall <br />include sub-consultant invoices, direct costs with receipts, and summary of tasks <br />completed in the report. <br />Task 1 Deliverables: <br />Electronic or online copies of the Agenda and Meeting Minutes (PDF format or <br />Google Document) <br />Monthly Invoices <br />Quality Control and Quality Assurance Reviews <br />Data Sharing Portal (Sharefile) <br />Task 2 – Pre and Post-Project Evaluation Strategy <br />2.1. Implementation Strategy <br />Consultant shall review the conceptual design and the preferred alternative that was <br />developed in the planning phase and determine the quick-build implementation strategy <br />ATTY/AGR.2021.075/Kimley-Horn (Roosevelt Quick-build Traffic Calming Project PS&E) (Page 11 of 17)