My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 8:56:10 AM
Creation date
8/17/2021 8:55:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
Agreement for Services (Gatekeeper)
RMP File Number
304
Date
6/28/2021
MO Ref
21-113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Main Circulation study. The fee for this task will be adjusted after assessment of available data and <br />models. <br />We will present level of service and queuing information for the crossings and adjacent intersections. <br />Task 4-8 – Site Access and Circulation Analysis <br />As part of this task, we will provide a qualitative assessment of site-access and circulation <br />considerations. For the individual Gatekeeper project sites, a detailed site access and circulation review <br />will occur when detailed site plans are available in subsequent review stages of the individual projects <br />and is not included in our proposed scope of work. <br />Task 4-9 – Documentation <br />Fehr & Peers will prepare a TA report for the Gatekeeper project. The report will include text, graphics, <br />and tables to describe the analysis methods and results, potential transportation impacts and adverse <br />effects, as well as corresponding mitigation measures and required improvements. Fehr & Peers will <br />submit the Administrative Draft TA in electronic format for review by the City and the environmental <br />consultant. This scope includes up to 16 staff hours for each project to respond to all comments on the <br />Administrative Draft TA report and prepare the Draft TA report to be used to prepare the EIR and be <br />included in the EIR appendix. <br />We have included an initial estimate of 20 hours in our fee for each project to respond to public <br />comments. However, since the magnitude and complexity of public comments will not be known until all <br />comments are received and compiled, we may need a budget amendment if the magnitude or complexity <br />of comments exceeds our assumed level of effort. <br />Task 4-10 – Meetings <br />Fehr & Peers will prepare for and attend up to four in-person project meetings with City staff and/or the <br />project team and three public hearings. We are available to attend additional meetings or public hearings <br />if requested on a time-and-materials basis. <br /> <br />REV: 06-23-21 MI <br />ATTY/AGR.2021.150/Environmental Sciences Associates (Gatekeeper Projects) (Page 48 of 58)
The URL can be used to link to this page
Your browser does not support the video tag.