Laserfiche WebLink
Proposed Work Program <br />June 2021 City of Redwood City / Transit District Subsequent EIR 2 <br />Environmental science associates <br />REV: 06-22-21 MI <br />The City further assumes that while each of the individual development proposals that comprise the Transit <br />District would be generally described in the EIR, the environmental analysis would not focus specifically each <br />individual development proposal. Rather, it is expected that the Transit District EIR would each assess the <br />collective impacts of the project at a programmatic level. <br />Lastly, the City assumes that once the proposed DTPP amendments are adopted and the program level final <br />SEIR is certified, a consistency initial study checklist would be completed for each individual development <br />proposal to determine whether each proposal would result in any new environmental effects not identified in <br />the DTPP Final EIR or the SEIR. The City indicates the consistency check process, however, is not part of the <br />subject SEIR scope of work. <br />Scope of Services <br />Task 1: Notices of Preparation, Project Description, Scoping Meeting <br />Notices of Preparation. ESA will prepare a draft and final Notice of Preparation (NOP) for the SEIR as required <br />by CEQA Guidelines Section 15082. To assist in maintaining the City’s fast-track schedule, an Initial Study will <br />not be included as an attachment to the NOP. If desired by the City, however, an Initial Study could be prepared <br />concurrent with, and included as an attachment to, the Draft SEIR. We have used this approach on other <br />projects as a way to focus out certain environmental topics from analysis when they would clearly be less than <br />significant. ESA will create a web-ready electronic copy of the NOP for posting on the City’s website and on the <br />State Clearinghouse’s CEQAnet database. <br />Project Description. The proposed Transit District will be described in the Draft SEIR in text, tabular, and <br />graphic form. The Project Description will draw from information about the projects provided by the City team <br />and its consultants. Given the complexity of the project, ESA will take care to organize and present this <br />information clearly. We will provide the City with a draft project description for review/sign-off prior to <br />initiating the technical analyses for the SEIR. <br />Scoping Meeting. During the 30-day NOP public comment periods, ESA will participate in a public scoping <br />meeting for the Transit District, in support of City staff. If needed, ESA can arrange for a court reporter at the <br />scoping meetings to prepare a transcript and officially document the oral testimony (as an optional task). <br />Following the close of the 30-day public scoping period for the NOP, ESA will review and catalog the scoping <br />comments received on the NOP, provide this summary to the City, and determine if any changes or refinements <br />are required in the SEIR scope of analysis. <br />Task 2: Prepare Administrative Draft SEIR <br />The project team will prepare the Administrative Draft of the SEIR in electronic form (Word and PDF). The <br />Administrative Draft SEIR will be prepared in accordance with current City guidelines. City staff will review <br />the Administrative Draft SEIR and provide ESA with one consolidated set of non-contradictory comments on <br />the SEIR. <br />The following discussion presents our approach to the SEIR and strategic considerations related to the <br />preparation and presentation of individual sections. <br />ATTY/AGR.2021.149/ESA (Transit District CEQA) (Page 12 of 26)