My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21-YEI Engineers, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21-YEI Engineers, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:13:26 PM
Creation date
10/18/2021 3:13:07 PM
Metadata
Fields
Template:
Agreement
Contractor Name
YEI Engineers, Inc
PROJECT NAME
Design, engineering, and construction support services
RMP File Number
304.5
Date
10/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 10-1-21 RL <br />EXHIBIT “A” <br />SCOPE OF SERVICES <br />Design, Engineering, and Construction Support Services <br />Location: Fair Oaks Community Center - (2600 Middlefield Road) <br />Project: Administrative Office Remodel <br />Consultant shall provide the following services for the above referenced project: <br />•Perform site observation of the space. <br />•Mechanical work will provide HVAC design based on the new layout. <br />•Electrical work will provide new lighting and power for the newly <br />configured space, <br />•Assume that the fire sprinkler and fire alarm systems are up <br />to date and the work will provide conceptual design as part of <br />the deferred submittal and provide performance base <br />specification. <br />•Perform calculations and Mechanical/Electrical Title 24 report for the <br />project. <br />•Develop technical specifications and place in the drawings. <br />•Submit construction documents for Plan Check review and permitting. <br />•Prepare issued for construction drawings and specifications. <br />•Provide construction support services such as review of <br />contractor’s product submittals, respond to RFIs, attend two <br />construction meetings, perform punch walk and list and prepare <br />record drawings based on contractor’s redline markups. <br />Key Personnel <br />Patrick Mallillin, P.E. – President/Project Manager <br />Bryan Hayes, P.E. – Mechanical Engineer <br />Timothy Le, P.E. – Electrical Engineer <br />The following services are excluded from the scope of services for the project <br />referenced above: <br />•Energy Analysis and Energy Modeling. <br />•Life Cycle Cost Analysis <br />•Power monitoring and electrical data logging. <br />•Security system design. <br />•Telecommunication system design. <br />•Hydraulic calculations. <br />•Civil and Structural designs. Civil shall provide utility drawings <br />beyond 5 feet of the building. YEI will perform the electrical site <br />design. <br />ATTY/AGR.2021.252/YEI Engineers, Inc. (Design, Engineering, and Construction Support Serv) (Page 11 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.