Laserfiche WebLink
17060 P a g e | 3 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />The utilities locating subconsultant will use marking paint while on-site to show where the utilities are located. The <br />utilities locating subconsultant will perform an on-site utility survey using RTK GPS or total station methods. Utility <br />survey shall be on the California State Plane Zone III coordinate system and NAVD 88 vertical datum. <br />Deliverables: <br />Utility Map (ACAD & PDF) <br />Task 2.3 – Gather and Review City SCADA and System Info <br />The Consultant understands that the City contracts with TELSTAR Instruments (TELSTAR) for process control at its <br />pump stations and will work with TELSTAR to understand the City’s existing Supervisory Control and Data <br />Acquisition (SCADA) system and specific compatible equipment within the construction contract documents. <br />Task 2.4 – Perform Topographic Surveying and Mapping <br />The Consultant will provide a topographic survey for the Pump Station project site to develop a basis for the site <br />improvements. <br />The Consultant will develop a base map. The base map will include features that represent the underlying <br />foundation information in which the project is based upon. The Consultant will prepare the topographic base <br />mapping for the project. Surface features necessary for the plans (e.g. drain inlets, trees, water valves, etc.), utility <br />information and base mapping approximately 20 feet beyond the limits of the project shall be included. Examples <br />of base map information includes, but is not limited to, aerial imagery, street network information, elevation <br />datasets, utilities locations, and boundaries such as parcel lines, and City limits. The Consultant recommends <br />maintaining the features of the base map using both CAD drawings in ground coordinates, and a standard GIS <br />projection such as California State Plane Zone 3 US Survey Feet to ensure that the information is compatible with <br />other GIS platforms and applications. The boundary information developed in Task 2 will be incorporated into the <br />base map. <br />Office Survey <br />The prime consultant’ survey office staff consists of a professional land surveyor (LS), a survey coordinator, and a <br />survey office technician (LSIT). The Consultant will work to ensure that the field survey crew has the data needed to <br />perform both accurate and precise topographic and boundary surveys. The Consultant will prepare the field <br />surveyor’s daily planning information and site field survey instructions. These instructions ensure that the field crew <br />has all the equipment, material, and access information to safely perform the field survey. The office survey staff is <br />accessible to the survey crew via telephone, text, email, and Trimble “Access” software. The office survey staff will <br />calculate the record right-of-way and boundary mapping information within an AutoCAD Civil 3D 2015 drawing. The <br />collected field survey coordinate point information shall be downloaded and combined with the record right-of-way <br />and boundary information by the prime consultant. <br />Field Survey <br />The prime consultant’s field survey crew consists of two highly experienced men who have completed and passed <br />the union journeyman certifications. They are equipped with the latest in modern surveying equipment. This <br />includes Trimble R8 GPS base and rover receivers, a Trimble S6 robotic total station, a digital level, plus standard <br />supporting and safety. The field crew will establish the site survey coordinate control from NGS monuments based <br />on the California Coordinate System, NAD 83, NAVD 88 coordinates utilizing GPS equipment. They will also search, <br />recover, and tie record boundary and right-of-way monumentation. Finally, the prime consultant’s survey crew will <br />interview with the survey office staff to discuss the project activities and field notes at the end of each day. <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 14 of 40)