17060 P a g e | 19 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />7. Installation of concrete wall within the influent structure <br />8. CLSM or aggregate fill of pump station and trash rack sump <br />9. Concrete cap pump station operating floor voids and trash rack opening <br />Deliverables: <br />Plans, Specifications, and Cost Estimate incorporated into Task 4 submittal package: 60%, 90%, 100% (Final) <br />Drawings, Specifications, and 60%, 90%, 100% (Final) Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each, 60%, 90%, 100% (Final) Comment/Response Log <br />Bidding Phase Services: Pre-bid meeting site visit, Assist City with Review of Bids <br />Task 8.4 Green Infrastructure <br />Based on Redwood City’s adopted “Green Infrastructure Plan”, June 2019 (mapped at <br />https://webgis.redwoodcity.org/storymap/greeninfrastructure/), the City has not identified the types of green <br />infrastructure that can be included in the pump station rehabilitation project. See the table below: <br />The Consultant will identify potential green infrastructure that can be added to the pump station site based on the <br />design alternative selected as part of the project. The types of green infrastructure that will be reviewed include <br />stormwater planters, stormwater curb extensions, rain gardens, green gutters, tree well filters, stormwater trees, <br />trees, infiltration systems, pervious pavements, green roofs, green walls, rainwater harvesting, or vegetated swales. <br />The Consultant will document the assessment and the selection of the green infrastructure and add green <br />infrastructure facilities to the design if appropriate facilities are identified. The design will be developed in <br />accordance with the “FlowstoBay, PDF Guidebook (https://www.flowstobay.org/wp- <br />content/uploads/2020/03/GIDG-2nd-Edition-2020-03kh-RED.pdf). <br />The City has identified green infrastructure near the proposed storm drainage pipe improvements. However, the <br />improvements are “parcel based” according to the Green Infrastructure Plan identified above. Therefore, it is <br />assumed that no green infrastructure improvements will be included in the storm drainage pipe design. See the <br />map below: <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 30 of 40)