My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/18/2021 3:46 PM
Modified:
10/18/2021 3:46 PM
Text:
https://webgis.redwoodcity.org/storymap/greeninfrastructure/
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/18/2021 3:46 PM
Modified:
10/18/2021 3:46 PM
Text:
https://www.flowstobay.org/wp-content/uploads/2020/03/GIDG-2nd-Edition-2020-03kh-RED.pdf
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/18/2021 3:46 PM
Modified:
10/18/2021 3:46 PM
Text:
https://www.flowstobay.org/wp-content/uploads/2020/03/GIDG-2nd-Edition-2020-03kh-RED.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17060 P a g e | 19 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />7. Installation of concrete wall within the influent structure <br />8. CLSM or aggregate fill of pump station and trash rack sump <br />9. Concrete cap pump station operating floor voids and trash rack opening <br />Deliverables: <br />Plans, Specifications, and Cost Estimate incorporated into Task 4 submittal package: 60%, 90%, 100% (Final) <br />Drawings, Specifications, and 60%, 90%, 100% (Final) Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each, 60%, 90%, 100% (Final) Comment/Response Log <br />Bidding Phase Services: Pre-bid meeting site visit, Assist City with Review of Bids <br />Task 8.4 Green Infrastructure <br />Based on Redwood City’s adopted “Green Infrastructure Plan”, June 2019 (mapped at <br />https://webgis.redwoodcity.org/storymap/greeninfrastructure/), the City has not identified the types of green <br />infrastructure that can be included in the pump station rehabilitation project. See the table below: <br />The Consultant will identify potential green infrastructure that can be added to the pump station site based on the <br />design alternative selected as part of the project. The types of green infrastructure that will be reviewed include <br />stormwater planters, stormwater curb extensions, rain gardens, green gutters, tree well filters, stormwater trees, <br />trees, infiltration systems, pervious pavements, green roofs, green walls, rainwater harvesting, or vegetated swales. <br />The Consultant will document the assessment and the selection of the green infrastructure and add green <br />infrastructure facilities to the design if appropriate facilities are identified. The design will be developed in <br />accordance with the “FlowstoBay, PDF Guidebook (https://www.flowstobay.org/wp- <br />content/uploads/2020/03/GIDG-2nd-Edition-2020-03kh-RED.pdf). <br />The City has identified green infrastructure near the proposed storm drainage pipe improvements. However, the <br />improvements are “parcel based” according to the Green Infrastructure Plan identified above. Therefore, it is <br />assumed that no green infrastructure improvements will be included in the storm drainage pipe design. See the <br />map below: <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 30 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.