Laserfiche WebLink
17060 P a g e | 18 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Task 7 – Optional Tasks <br />The consultant team will provide optional tasks services to the City only upon written approval and authorization. <br />Task 7.1 – Electrical Building <br />The consultant team will design a building locate at the Bradford pump station site to house electrical and controls <br />equipment. The building will be constructed of CMU walls with a wood frame roof and the building footprint will be <br />approximate 25’ x 30’. Building HVAC equipment will be limited to exhaust fans and air intake louvers. Heating and <br />air condition equipment is not included within the scope of design. The architectural subconsultant will provide <br />architectural design services for the building. <br />The electrical integration and controls engineering subconsultant will provide electrical design services for the <br />building. It is assumed the electrical equipment will be mounted in standard NEMA 12 enclosures. <br />Deliverables: <br />Plans, Specifications, and Cost Estimate incorporated into Task 4 submittal package: 60%, 90%, 100% (Final) <br />Drawings, Specifications, and 60%, 90%, 100% (Final) Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each, 60%, 90%, 100% (Final) Comment/Response Log <br />Bidding Phase Services: Pre-bid meeting site visit, Assist City with Review of Bids <br />Task 7.2 Video Surveillance Security System <br />The electrical integration and controls engineering subconsultant will design a video surveillance security system. <br />This task is included to implement an active security scheme based on site CCTV monitoring. Work will include a <br />review of alternatives for CCTV video monitoring of the building access and incorporate the preferred alternative <br />into the design documents. Alternatives will review feasibility of the City’s standard SCADA communication medium <br />to support video bandwidth requirements for remote transmission, local storage, remote monitoring workstation <br />(hardware and software), and compatibility with other City SCADA or wide area network infrastructure. <br />Deliverables: <br />Plans, Specifications, and Cost Estimate incorporated into Task 4 submittal package: 60%, 90%, 100% (Final) <br />Drawings, Specifications, and 60%, 90%, 100% (Final) Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each, 60%, 90%, 100% (Final) Comment/Response Log <br />Bidding Phase Services: Pre-bid meeting site visit, Assist City with Review of Bids <br />Task 7.3 Existing Pump Station Demolition / Decommissioning <br />The Consultant and the electrical integration and controls engineering subconsultant will design the demolition and <br />decommissioning of the existing Bradford Pump Station. The scope includes the following items: <br />1. Demolition of the existing building, guard rail, and bollards <br />2. Removal of the following electrical equipment: motor control center, switchboard, breaker panels, interior <br />lighting, exterior lighting, conduit and wire <br />3. Removal all four storm drain pumps <br />4. Removal of trash rack <br />5. Removal of discharge flap gates <br />6. Removal natural gas piping <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 29 of 40)