My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17060 P a g e | 18 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Task 7 – Optional Tasks <br />The consultant team will provide optional tasks services to the City only upon written approval and authorization. <br />Task 7.1 – Electrical Building <br />The consultant team will design a building locate at the Bradford pump station site to house electrical and controls <br />equipment. The building will be constructed of CMU walls with a wood frame roof and the building footprint will be <br />approximate 25’ x 30’. Building HVAC equipment will be limited to exhaust fans and air intake louvers. Heating and <br />air condition equipment is not included within the scope of design. The architectural subconsultant will provide <br />architectural design services for the building. <br />The electrical integration and controls engineering subconsultant will provide electrical design services for the <br />building. It is assumed the electrical equipment will be mounted in standard NEMA 12 enclosures. <br />Deliverables: <br />Plans, Specifications, and Cost Estimate incorporated into Task 4 submittal package: 60%, 90%, 100% (Final) <br />Drawings, Specifications, and 60%, 90%, 100% (Final) Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each, 60%, 90%, 100% (Final) Comment/Response Log <br />Bidding Phase Services: Pre-bid meeting site visit, Assist City with Review of Bids <br />Task 7.2 Video Surveillance Security System <br />The electrical integration and controls engineering subconsultant will design a video surveillance security system. <br />This task is included to implement an active security scheme based on site CCTV monitoring. Work will include a <br />review of alternatives for CCTV video monitoring of the building access and incorporate the preferred alternative <br />into the design documents. Alternatives will review feasibility of the City’s standard SCADA communication medium <br />to support video bandwidth requirements for remote transmission, local storage, remote monitoring workstation <br />(hardware and software), and compatibility with other City SCADA or wide area network infrastructure. <br />Deliverables: <br />Plans, Specifications, and Cost Estimate incorporated into Task 4 submittal package: 60%, 90%, 100% (Final) <br />Drawings, Specifications, and 60%, 90%, 100% (Final) Opinion of Probable Cost of Construction: Five (5) <br />11”x17” bound hardcopy drawing sets, five (5) bound hardcopy specification sets, and one (1) electronic <br />Adobe Acrobat (PDF) copy of each, 60%, 90%, 100% (Final) Comment/Response Log <br />Bidding Phase Services: Pre-bid meeting site visit, Assist City with Review of Bids <br />Task 7.3 Existing Pump Station Demolition / Decommissioning <br />The Consultant and the electrical integration and controls engineering subconsultant will design the demolition and <br />decommissioning of the existing Bradford Pump Station. The scope includes the following items: <br />1. Demolition of the existing building, guard rail, and bollards <br />2. Removal of the following electrical equipment: motor control center, switchboard, breaker panels, interior <br />lighting, exterior lighting, conduit and wire <br />3. Removal all four storm drain pumps <br />4. Removal of trash rack <br />5. Removal of discharge flap gates <br />6. Removal natural gas piping <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 29 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.