My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:46:23 PM
Creation date
10/18/2021 3:45:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rogers, Inc.
PROJECT NAME
Bradford Storm Drain Pump Station Project
RMP File Number
304
Date
10/18/2021
MO Ref
21-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17060 P a g e | 25 <br />Proposal for Storm Drain Pump Station Improvements Projects <br />BRADFORD PUMP STATION <br />Task 8.2.5 CWA Section 401 Application for Water Quality Certification/Waste Discharge Requirement <br />The environmental specialist subconsultant will prepare a Water Quality Certification (WQC)/ Waste Discharge <br />Requirement (WDR) application for the San Francisco Bay Regional Water Quality Control Board (RWQCB) <br />containing the following information: <br />401 Certification Pre-Filing Meeting Request <br />Cover Letter. <br />FORM R2C502-E. This is the standard form for 401 Water Quality Certification and Report of Waste Discharge. <br />Project description. <br />Impacted water bodies (extent of dredge and fill). <br />Construction BMPs, Spill Prevention and Response Plan, and Dewatering Plan (if available). <br />CEQA documentation (as provided by the City or prepared under above optional tasks). <br />The draft application will be submitted electronically to the City for review and revised per City guidance. Before <br />submitting the WQC application package to the RWQCB, it is mandatory that a Pre‑filing Meeting be requested. The <br />environmental specialist subconsultant will prepare a 401 Certification Pre-filing Meeting request for the City to <br />submit to the RWQCB. The RWQCB will determine whether the meeting will be held. The request for a pre-filing <br />meeting is now a standard requirement of the RWQCB. <br />Supplemental information or data may be requested by the RWQCB during the application review process. The <br />environmental specialist subconsultant will support the information response process with the RWQCB, as <br />remaining budget is available in this task once the permit application is developed and submitted. The City will be <br />responsible for paying and processing the application fee required by RWQCB. <br />Deliverables: <br />Pre-filing Project PowerPoint presentation (electronic) <br />Draft SF Bay RWQCB Application submitted to City (electronic) <br />Revised SF Bay RWQCB Application submitted to RWQCB (electronic) <br />Up to two (2) conference calls <br />Task 8.2.6 F&G Section 1602 Application for Lake and Streambed Alteration Agreement <br />The environmental specialist subconsultant will develop a standard application for a Streambed Alteration <br />Agreement (SAA) under Fish and Game Code (F&G) Section 1602 for the California Department of Fish and Wildlife <br />(CDFW). The application material will follow the CDFW EPIMS External Permitting Portal application format. The <br />environmental specialist subconsultant will also prepare supplemental information, including a project description, <br />and construction BMPs, and other maps and figures as needed to support the application. The environmental <br />specialist subconsultant will prepare and submit a draft version of the above documents for review by the City. The <br />environmental specialist subconsultant will revise the application materials based on City feedback. This scope of <br />work assumes the City will open an SAA application in the EPIMS system to initiate the application process and <br />upload the SAA application material into the EPIMS system. If the City would like The environmental specialist <br />subconsultant to submit the application materials, then the City can add the environmental specialist <br />subconsultant’s project manager under the ‘Additional Contacts’ field in the EPIMS system for the project, which <br />would enable the environmental specialist subconsultant to directly upload the application material into the EPIMS <br />system. Additional effort for the environmental specialist subconsultant to upload application materials is not <br />included in this scope of work or associated cost estimate but could be performed if there is remaining budget in <br />this task once the permit application materials have been developed and submitted. <br />ATTY/AGR.2021.257/Wood Rodgers, Inc. (Bradford Storm Drain Pump Station Design) (Page 36 of 40)
The URL can be used to link to this page
Your browser does not support the video tag.