My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-10-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-10-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:10:19 PM
Creation date
10/8/2009 2:13:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1 B <br /> Page 2 <br /> encountered at the bridge have the greatest potential for impact to the project schedule <br /> and cost. In order to avoid costly delays and contractor's overhead expenses, the <br /> contractor was directed by staff to proceed with the work. The final change order <br /> amount will be determined at the end of the projeet as the project team continues to <br /> work collaboratively with the contractor to deli�er this project without significant delays <br /> and additional costs associated with delays. <br /> Anticipated change order activity (combined with change orders already issued) totals <br /> $185,551.00 and is 20% more than the originally awarded contract amount of <br /> $949,450.00. Council has previously authorized change order activity up to 10% of the <br /> awarded contract amount. Staff requests that Council authorize the City Manager to <br /> increase the contract amount up to 25% to accommodate existing and future change <br /> order activity generated by this project. <br /> ALTERNATlVES <br /> Council may choose not to authorize the additional funding, which would be contrary to <br /> prior Council action and potentially expose the City to overhead and delay damages <br /> incurred by the contractor. <br /> FISCAL IMPACT <br /> Funds have been appropriated from the Water Revenue Bond proceeds. The City has <br /> issued a series of three Water Revenue Bonds to finance Phase 1 of the Recycled <br /> Water Project. Currently available project funds, less unattributed interest, total <br /> $6,542,358.86 as of August 31, 2009. Up to 25% of eligible construction costs of Bid <br /> Packages 5 through 9 may be reimbursed by the State's Proposition 13 Vllater <br /> Recycling Grant Program. <br /> , <br /> Phong Du, PE Brian Lee, PE <br /> Senior Civil Engineer Supervising Civil Engineer <br /> h <br /> Chu Chang, PE, LEED Peter Ingram <br /> Building, Infras#ructure and City Manager <br /> Transportation Director <br /> ATTACHMENTS <br /> None <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> None <br />
The URL can be used to link to this page
Your browser does not support the video tag.