My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-10-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-10-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2013 12:10:19 PM
Creation date
10/8/2009 2:13:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
10/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1 D <br /> Page 1 <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the Ci Mana er <br /> October 12, 2009 <br /> SUBJECT <br /> Award of Contract— Redwood Shores Lagoon Maintenance Dredging Project <br /> REC�MMENDATION � <br /> By motion: <br /> 1. Approve the contract documents <br /> 2. Award the contract for the Redwood Shores Lagoon Maintenance Dredging Project <br /> to Aquatic Environments of Concord based on the lowest �otal responsible bid <br /> amount <br /> 3. Authorize the City Manager to execute the contract for the base bid amount of <br /> $712,700.00 and inc�ease the contract amount up to 1�% if necessary. <br /> BACKGROUND <br /> The Redwood Shores Lagoon System Dredging project is designed to impro�e the <br /> water quality and the serviceability of the Redwood Shores storm drainage system <br /> which includes the lagoons. The lagoons in Redwood Shores have not been dredged <br /> since they were first created and silt depos�#s have accumulated for over forty years <br /> from storm run off and the bay's tidal action. Silt bui(d-up adversely effects water <br /> circulation which encourages the growth of widgeon weed. Removal of as much of the <br /> deposited silt as possible, particularly near the in-take area, will improve the water <br /> circulation. <br /> Dredging is planned in certain areas of the lagoon where hydrographic sunreys ha�e <br /> identified excessive silt build-up and where the dredged material has been approved for <br /> relocation within Redwood Shores. Much of the dredged material from this project will <br /> be incorporated into "The Preserves" project to restore the wetlands in Area H. The <br /> opportunity for beneficial reuse of dredged material results in a substantial cost savings <br /> to the cifiy and accelerates the restoration of the wetlands by the developer. <br /> The three (3) bids received at bid opening on September 1�, 2�09, are summarized <br /> below: <br /> BASE BID OPTIONAL BID <br /> BIDDER AMOUNT ITEMS AMOUNT T�TAL <br /> Clean Harbors Environmental Services, Inc.— $1,105,294.00 $985,359.25 �2,090,573.25 <br /> Norwell, MA <br /> A uatic Environments-Concord 712,700.00 1,473,064.00 2,185,1fi4.00 <br /> Waterworks lndustries, lnc. -Windsor 83fi,941.60 1,822,287.74 2,659.229.34 <br /> En ineer's Estimate $889,030.00 $1,022,680.00 $1,911,710.0� <br /> Recommended Bidder. Aquatic Environments of Concord, CA <br /> Subs ntiation: Aquatic Environments of Concord, CA is the lowest <br /> responsive and responsible bidder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.