My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Technology, Engineering & Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Technology, Engineering & Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2021 11:23:04 AM
Creation date
11/19/2021 2:15:29 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Technology, Engineering & Construction, Inc.
PROJECT NAME
Consultant to perform underground and aboveground storage tank maintenance, monitoring, inspection, testing, repair and training services
Date
11/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 10-14-2021 RL <br />Consultant shall provide the monitoring, inspection, and testing services outlined in Section 1.4, Subsections A- <br />J, for a not-to-exceed amount of $19,400.00 per year, for a total not-to-exceed amount of $97,000.00 over the <br />five-year term of the Agreement. Fees will be billed on a per service basis upon completion of each service per <br />the Pricing Table delineated below. City shall pay Consultant a not-to-exceed amount of $403,000.00 over the <br />term of the Agreement for Additional Services based upon hourly labor and the cost of parts, as delineated in the <br />Additional Services table below. <br />5-Years Total Monitoring, Inspection, and Testing Services (Not-to-Exceed)____________ $97,000.00 <br />Total Additional Services (As Needed) ________________________________________$403,000.00 <br />5-Year Contract Total (Not-to-Exceed) ________________________________________$500,000.00 <br />PRICING TABLE –ANNUAL SERVICE <br />No.Description of Service Quantity Unit Cost per Unit Total Cost <br />PER YEAR <br />1.Monthly Inspection (UST)26 each $200 <br />2.Annual Monitoring System <br />Certification (UST) <br />2 each $425 <br />3.Annual Spill Container Testing <br />(UST) <br />3 each $50 <br />4.Annual Monitoring System <br />Certification (AST) <br />7 each $375 <br />5.Triennial Overfill Prevention <br />Equipment Inspection (UST) <br />3 each $475 <br />6.SB 989 Triennial Secondary <br />Containment Testing (PD UST) <br />1 each $1,200 <br />7.SB 989 Triennial Secondary <br />Containment Testing (FS 9 USTs) <br />1 each $1,600 <br />8.Annual Designated Operator <br />(D O )Employee Training <br />(UST/AST) <br />2 each $0 – included <br />in DO Cost <br />9.Annual SP001 Inspection and <br />Integrity Testing (AST) <br />7 each $650 <br />10.Annual Gasoline Dispensing <br />Facility Testing (BAAQMD – <br />AST/UST) <br />4 each $450 <br />TOTAL $19,400 <br />ATTY/AGR.2021.262/TEC Accutite (Page 18 of 19)
The URL can be used to link to this page
Your browser does not support the video tag.