Laserfiche WebLink
REV: 11-23-2021 <br />B. If a written amendment to extend the agreement as described in Section 3 <br />(Term) of the agreement is executed, Contractor shall additionally receive a <br />flat-rate fee of Nineteen Thousand Eight Hundred Dollars ($19,800) for the <br />cleaning, inspection, and reporting for the potable water storage tanks <br />identified below. This rate shall include all cleaning, inspection and reporting <br />work. <br />Tank <br />Cleaning (up to 3” of <br />Sediment), Inspection and <br />Report <br />Glenloch $1,000 <br />Easter Cross $1,000 <br />Lakeview $3,000 <br />Peninsula 2 $3,000 <br />Sequoia 1 $3,000 <br />Sequoia 2 $3,000 <br />Cambridge 1 $1,000 <br />Cambridge 2 $1,000 <br />Easter Bowl $1,900 <br />California $1,900 <br />Total for Cleaning, Inspection & Report $19,800 <br />ATTY/AGR.2021.301/H2O Solutions, L.L.C. (Water Tank Inspection, Cleaning & Repair Services) (Page 16 of 18)