Laserfiche WebLink
REV: 01-12-2022 RL <br />Additional Hole-Drilling for Structural Attachment: <br />Contractor shall provide the following: <br />•Setup and layout of additional frame holes <br />•Drill additional holes in frames (2) <br />•Cold-Galvanize spray new holes <br />•Create template for pilot holes <br />•Layout and drill pilot holes for pressure treated curb <br />•Provide extra attachment hardware and labor as required for installation <br />Based On: <br />•Engineered drawing provided by City (SK-1 Frame Anchorage) <br />Excludes: <br />•Engineering, bonds, permits testing or inspections of any kind <br />•Any other item, task, labor or materials not specifically included <br />FEE <br />The City shall pay Contractor on a per task basis, per the fee schedule below in an amount not to <br />exceed One Hundred Ninety-Five Thousand Dollars ($195,000). Any additional change orders <br />identified shall be approved by the Public Works Services Facilities Superintendent or their <br />designee prior to any work being conducted. Total compensation under the Agreement for <br />Services will be in an amount not to exceed Six Hundred Sixty-Five Thousand Three Hundred <br />Seventy-Nine Dollars ($665,379). Invoices shall be billed monthly with Net 30 payment terms. <br />Total for all Change Orders <br />outlined in Scope of Services <br />Flat Rate Amount of $119,994 <br />Contingency Funding Not to Exceed $75,006 <br />subject to additional change <br />orders approved by the <br />Facilities Superintendent or <br />their designee. <br />Total Not-To-Exceed Amount <br />for Amendment No. 1 <br />Not-to Exceed $195,000 <br />ATTY/AGR.2022 - Amend No. 1/Pacific Coast Sales & Service, Inc. (Page 5 of 5)