My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 California Water
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Under $ 100K
>
Agmt22 California Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 12:06:34 PM
Creation date
2/17/2022 12:06:12 PM
Metadata
Fields
Template:
Agreement
Contractor Name
California Water
PROJECT NAME
Service for limited emergency water supply interconnection
Date
1/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-29-2021 MI <br />2. Interconnection Location. The Interconnection, as conceptually shown on the drawings <br />attached as Exhibit “A”, is anticipated to be located along Godetia Road, and is anticipated <br />to begin construction in 2021. The scope will include the following facilities: portable <br />booster connection (fire hydrant, ports, valve), gate valves, and a ductile iron main <br />extension totaling approximately 1,170 linear feet. <br />3. Use of Interconnection. In the event either Party requires supplemental water for a limited <br />period of time due to an Emergency or Maintenance (as defined and described in Section <br />6(C), titled Sale of Water), such Party shall have the right to obtain supplemental water from <br />the other Party via the Interconnection pursuant to Sections 6 and 7of this Agreement. <br />When the Intertie is activated, it shall operate only when and to the extent the supplying <br />Party is capable of providing supplemental water above and beyond that which is required <br />to service its own needs. <br />4. Water Supply is for a Limited Purpose Only. Nothing herein shall be deemed to constitute <br />a dedication of the water supply of either Party to service the territory of the other Party <br />or to constitute a commitment to supply water to the other Party as a regular customer. <br />5. Construction of Godetia Rd Interconnection. The estimated current cost to design, <br />purchase materials and construct the Interconnection is THREE HUNDRED NINETY <br />THOUSAND AND NO/100 DOLLARS ($390,000.00). Cal Water will assume primary <br />responsibility for the design, material purchase, and construction of the Interconnection. <br />City will not be required to compensate Cal Water for this transaction. Specifically, Cal <br />Water will complete the following tasks: <br />A. Cal Water Construction Obligations. In connection with the Interconnection, Cal <br />Water shall be responsible for the following: <br />i.Prepare contract specifications and drawings; <br />ii.Obtain necessary permits and approvals (i.e. Encroachment permit); <br />iii.Cal Water’s master contractor, West Valley Construction, will perform the <br />work via competitively bid line item contract rates; <br />iv. Perform inspections and construction oversight; <br />v.Provide all final testing and commissioning activities to accept the completed <br />work (i.e. pressure testing, disinfection, and water quality sampling). <br />vi.Reimburse City for any and all costs to repair City pipelines, valves, and related <br />water system appurtenances that are damaged during construction. <br />B. Cal Water Construction Costs/ City’s Obligations. Cal Water will pay for all costs <br />pertaining to the design, material purchase, and construction of the main extension <br />and one (1) new portable booster connection. The City maintains an existing fire <br />hydrant, which may be utilized to facilitate any future temporary emergency <br />interconnections. Cal Water will install all facilities pursuant to the approved plans. <br />Each Party will maintain and retain ownership of their individual, physically <br />separated systems. City shall reasonably cooperate as necessary to support Cal <br />Water’s completion of construction obligations set forth in Section 5.A above, such <br />as providing existing maps, drawings, plans and surveys and other documents <br />ATTY/AGR.2021.309/California Water Service (Page 2 of 14)
The URL can be used to link to this page
Your browser does not support the video tag.