My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Crosby Group Architects, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Crosby Group Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 9:56:17 AM
Creation date
3/2/2022 10:21:39 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Crosby Group Engineers Architects, Inc. DBA Crosby Group
PROJECT NAME
Architectural Design Services
RMP File Number
304
Date
1/5/2022
MO Ref
21-221
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-23-2021 MI <br />4. Detail design and development for site specific details, City Standard details <br />and other agency standard details as required. <br />5. Technical specifications shall be in City Standard, CSI or Caltrans format, as <br />directed by City. Unless stated otherwise, project specifications shall include <br />Measurements and Payments clause that correspond with project Bid <br />Spreadsheet. <br />6.Provide all plan work to the City of Redwood City in AutoCAD 2010 or newer <br />format (as approved by Public Works Facilities Superintendent) and word <br />processing work in MS Word (most recent version). <br />7. Project Administration as required. <br />Bidding and Construction Phase: <br />1.Provide assistance during the Construction bidding process, including to <br />attend pre- bid and pre-construction meetings; respond to bidder's questions <br />and prepare Addenda as necessary; assist City in qualifying bidders, <br />evaluation of bonds, insurance coverage, financial capability, and experience; <br />assist City in bid analysis. <br />2.Substitution Request evaluation. <br />3.Review of submittals and shop drawings. <br />4.Review and respond to contractor Request for Information (RFI). <br />5.Change Order evaluation as necessary. <br />6.Provide support to City inspectors as necessary. <br />7.Architectural Commissioning, including photometric testing, inspection <br />verifying that installed systems are in compliance with project scope, City <br />standards and requirements, and Title 24 compliance. <br />8.Attend construction punch walk and generate project punch list. <br />9.Project Administration as required. <br />10.Provide Conformed Set of Project Documents CAD and PDF format at project <br />completion for City's records. <br />ATTY/AGR.2021.302/Crosby Group Engineers Architects, Inc. dba Crosby Group (Page 12 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.