My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt 22 BKF On-call Surveying Services
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt 22 BKF On-call Surveying Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2024 12:22:13 PM
Creation date
3/25/2022 10:21:19 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Surveying Services
RMP File Number
304
Date
1/11/2022
MO Ref
21-230
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 12-02-2021 VR <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />The Consultant shall provide on-call, as needed Surveying Services; as requested and as <br />specified for various City approved projects and tasks in each particular “On-Call, As <br />Needed Surveying Services" request. Such work shall be within the Consultant's area of <br />competence, experience and expertise; as outlined on the Statement of Qualifications <br />submitted by the Consultant to the City of Redwood City Engineering and Transportation <br />Division and previous Request for Proposals of Surveying Services. <br />Under this task, the Consultant shall prepare for the City, topographic survey base <br />maps, boundary surveys, legal descriptions, etc. for various City approved projects and <br />tasks. Base maps will be utilized during the design stage of upcoming Capital <br />Improvement Projects to determine all necessary physical features within the project <br />limits and the project scope as listed, but not limited to below. <br />1.1 SCOPE OF WORK: <br />The Consultant is to provide the following Scope of Services described herein as the minimum <br />necessary to meet the City's objectives. The Consultant is expected to expand on the scope by <br />'incorporating their expertise and may provide additional services that are not included in the work <br />with the consent of the City's Engineer. <br />1.The Consultant shall perform preparation of base map, as requested, and shall <br />include, but not limited to the following: <br />a.Project's Kick-off Meeting with the City. <br />i.Consultant shall meet with the City and prepare an agenda to discuss and clarify <br />the project's scope and goals, design assumptions, etc. <br />b.Ground Survey: Topographic survey shall include all physical features within the <br />project limit listed, include also any grade breaks or man-made improvements not <br />listed: <br />i.Sanitary sewer manhole rim and invert elevations, manhole pipe inverts and top <br />of pipe, pipe inverts at manhole for each and all pipes, pipe diameters, sanitary <br />sewer lateral cleanouts and sanitary sewer lines. Locate and determine exact <br />locations of existing sanitary sewer lateral cleanouts. Cleanouts that are not <br />found shall be labeled "CO NOT FOUND" on the base map. <br />ii.Storm drain or storm sewer manhole rim and invert elevations, manhole pipe <br />inverts and top of pipe, pipe inverts at manhole for each and all pipes, pipe <br />diameters, drain inlets bottom, drain inlets pipe inverts, catch basin grate <br />elevations and storm drain lines. <br />iii.Water valve boxes, meter boxes, anode boxes, fire hydrants and water lines. <br />Measure the distance to the top of the valve nuts. If the top of valve nut is not <br />exposed; a note of the field condition shall be added to the base map. <br />ATTY/AGR.2021.296/BKF ENGINEERS (Page 10 of 14)
The URL can be used to link to this page
Your browser does not support the video tag.